Road pile supporting structure arranged in front of multiple high-voltage towers

This utility model relates to a road pile support structure adjacent to multiple high-voltage power towers. It includes a first retaining wall installed on one side of the road adjacent to the multiple high-voltage power towers and located at the road edge line between the tops of the road cutting slopes at both ends. Second retaining walls are respectively installed within the first retaining wall between two adjacent high-voltage power towers and on the side of the road cutting slope near both ends. Crown beams are installed at the top of both the first and second retaining walls. Tie beams are respectively installed between the second retaining wall between two adjacent high-voltage power towers and the first retaining walls located on both sides of the second retaining wall. Tie beams are also installed between the second retaining wall on the side of the road cutting slope near both ends and the first retaining wall. This utility model, by setting up the first and second retaining walls and coordinating with tie beams to form a combined support system, is easy to operate, highly safe, and economical, ensuring the safety of the power towers and surrounding areas.
Owner:WUHAN MUNICIPAL ENG DESIGN & RES INST

Integrated anchor cable for soft and disintegrating rock mass and construction method

ActiveCN117722214BStrong support abilityprevent leakage
The present application relates to rock mass supporting technical field, provide a kind of integrated anchor cable for soft disintegrating rock mass and construction method, integrated anchor cable includes anchor cable, grouting pipe, expansion capsule, anchor cable tensioning lock, tray and aligning ball pad, anchor cable includes anchor cable exposed section, anchor cable tensioning section and anchor cable anchoring section in turn;The import of grouting pipe is set at anchor cable exposed section, the outlet of grouting pipe is set at the junction position of anchor cable tensioning section and anchor cable anchoring section;Expansion capsule is wrapped in the local cable section of anchor cable tensioning section, local cable section corresponds to the orifice position of drilling, expansion capsule is connected with grouting pipe, and expansion capsule expands under the grouting pressure of grouting pipe.By waterproof anchoring agent, anchor cable anchoring section is fixed with the hole wall of drilling, and the orifice of drilling is sealed by expansion capsule, avoid the leakage of slurry along the orifice position of drilling, can realize good tensioning effect and grouting effect, can provide good supporting capacity for soft disintegrating rock mass.
Owner:CCTEG COAL MINING RES INST +1

Foundation pit supporting passive area soil body reinforcing structure and construction method thereof

The invention discloses a foundation pit supporting passive area soil body reinforcing structure and a construction method thereof. The structure comprises fender posts arranged along the periphery of a foundation pit; the cement soil reinforcement area is located in the passive area soil body behind the fender posts, and the cement soil reinforcement area is formed by meshing a plurality of cement mixing piles; the high-pressure jet grouting pile reinforcing band is arranged between the fender post and the cement soil reinforcing area, and the high-pressure jet grouting pile reinforcing band fills a gap between the fender post and the cement soil reinforcing area, so that the fender post, the high-pressure jet grouting pile reinforcing band and the cement soil reinforcing area are in close contact, and a continuous force transmission system is formed. The gaps between the fender posts and the cement mixing piles are filled with the high-pressure jet grouting piles, force transmission is smooth, the passive area soil reinforcement effect is greatly improved, fender post deformation is effectively controlled, and the safety and stability of a foundation pit are guaranteed.
Owner:CHINA CONSTR FIRST DIV GROUP CONSTR & DEV

Adjustable supporting device for arc-shaped reserved hole concrete formwork

An adjustable supporting device for an arc-shaped reserved hole concrete formwork is mainly composed of a supporting plate (A), a fixing clamping block (B), a supporting ring (C) and a supporting rod (D) in the figure 1. According to the device, a set of stable and reliable steel structure frame body is provided, the jacking capacity is high, and the formwork is effectively fixed; the structure is simple and practical, combination, assembly, disassembly and replacement are convenient, the workload and labor cost can be effectively reduced, the high-altitude work amount can be reduced, and the risk that high-altitude spare parts fall down is reduced. The device is very high in usability and universality, convenient to transfer and transport, capable of being repeatedly used, capable of avoiding material waste, capable of meeting the national green construction requirement and good in technical and economic benefits and application and popularization value.
Owner:SHANGHAI ELECTRIC POWER SUPERVISION CONSULTATION CO LTD

Combined support structure and construction method for deep buried tunnels in clastic schist strata

ActiveCN111577321BEnsure excavation efficiencyStable and stableUnderground chambersTunnel liningStructural engineeringCatheter
The present invention discloses a combined support structure and a construction method for a deep buried tunnel in a clastic schist stratum. The combined support structure comprises an advance support, a tunnel steel arch frame and an anchor-sprayed mesh joint support; the advance support comprises a plurality of face fiber anchor rods vertically driven on the face, a plurality of sections of advance small conduit support and a grouting reinforcement area, the plurality of face fiber anchor rods completely cover the face, each section of the advance small conduit support is composed of a plurality of advance small conduits and the overlap length along the tunnel excavation direction is not less than 1m or 1 / 4L 导管 Each section of the advance small pipe support is a plurality of advance small pipes set within 120° on the arch of the tunnel face, and the grouting reinforcement area is the area where the fiber anchor rods and the surrounding rock of the tunnel face in the area where the advance small pipes are set are grouting. The invention effectively ensures the stability of the tunnel face, prevents the excavation face from sliding and collapses, and effectively controls the combined support structure of the support deformation, ensures construction safety, and improves construction efficiency.
Owner:CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +2

Waterproof and drainage construction method for building foundation pit

The invention discloses a waterproof and drainage construction method for a building foundation pit. The waterproof and drainage construction method comprises the following steps that (1) surveying, setting out and positioning are conducted on a designed foundation pit construction site; (2) a drilling machine is in place, support pile construction is conducted, and a first waterproof structure is formed; (3) constructing a protective layer on the periphery of the first waterproof structure to form a second waterproof structure; (4) foundation pit excavation construction is conducted within the range of the first waterproof structure according to the design drawing, after excavation is completed, top drainage grooves are constructed in the periphery of the top of the foundation pit, and bottom drainage grooves are constructed in the periphery of the inner side of the bottom of the foundation pit; (5) constructing a second drainage well below the bottom of the foundation pit; and (6) waterproof layers are constructed on the bottom face and the inner side face of the foundation pit, and overall waterproof and drainage construction is completed. According to the method, prevention and drainage of accumulated water around the foundation pit are combined, the drainage speed is high, the waterproof effect is good, no accumulated water and water seepage phenomena exist in the foundation pit, the influence of the surrounding accumulated water on the stability of the foundation pit is reduced, the supporting effect on the foundation pit is high, and the safety of the foundation pit is integrally improved.
Owner:CHINA ELECTRONICS ENGINEERING DESIGN INSTITUTECO LTD

A simulation device for a fuel cell stack

The present invention relates to the field of fuel cells, and in particular to a simulation device for a fuel cell stack, comprising a stack simulator, a BOP system, a simulated membrane electrode water permeability generation module, a simulated hydrogen reaction consumption module, a simulated stack anode resistance drop module, a hydrogen recycling module, a simulated product water vapor generation generation module, a simulated air reaction consumption module, a simulated stack cathode resistance drop module, a simulated stack cooling resistance module and a simulated stack control module. The fuel cell simulation stack is used to simulate the entire process of material reaction, the stack simulator is used as a simulated reaction site for the fuel cell, and the feed system of the BOP system is used to feed reactant hydrogen and air as well as coolant into the stack simulator. The simulated stack of the present invention is more reliable for reliability and life testing of a BOP system and its components, and the reliability and life testing of the BOP system will not be unable to be continued due to damage to a real stack.
Owner:DALIAN JINGYUAN HYDROGEN TECH CO LTD