Optimization method of hydropower cluster sending grid considering utilization rate of clean energy

A technology of clean energy and network structure optimization, applied in the field of power grids, to meet the requirements of ensuring the utilization rate of clean energy, reducing power waste, and promoting sustainable and healthy development

Active Publication Date: 2021-11-30
国家电网有限公司西南分部
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0025] The purpose of the present invention is to: provide a hydropower cluster sending network frame optimization method considering the utilization rate of clean energy, solve the long-term problem of the construction of the outgoing network frame under the background of the construction and development process of the leading reservoir, and establish a corresponding regional power balance According to the construction and operation of transmission channels, the development planning of hydropower station clusters and the timing of commissioning, the mathematical model is optimized, and the greedy algorithm is used to solve the corresponding power transmission alternatives, and finally the evaluation method of entropy weight method is used to evaluate each Evaluate the alternatives, and select the optimal solution for hydropower cluster transmission and related grid construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Optimization method of hydropower cluster sending grid considering utilization rate of clean energy
  • Optimization method of hydropower cluster sending grid considering utilization rate of clean energy
  • Optimization method of hydropower cluster sending grid considering utilization rate of clean energy

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0125] The preferred embodiment of the present invention provides a method for optimizing the transmission grid of a hydropower cluster considering the utilization rate of clean energy. Taking the test system of IEEE39 nodes as an example, the network topology diagram is as follows: Figure 4 shown.

[0126] The data of the actual cascade hydropower station in a certain watershed is used, and it is connected to its BUS-33, BUS-34, BUS-35, BUS-36, BUS-37, BUS-38 and BUS-39 respectively, and the wind power cluster is connected as a renewable energy source. Entering into BUS-30, the parameters such as the monthly output and installed capacity of a certain level water of the cascade hydropower station are shown in Table 1 - the installed capacity and output parameters of the cascade hydropower station.

[0127] Table 1 (unit: MW)

[0128]

[0129] Due to the limitation of the channel capacity, the electric energy generated by the wind power cluster may not be completely absorb...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a method for optimizing a hydropower cluster sending network structure considering the utilization rate of clean energy, calculates the degree of membership of each scheme corresponding to the evaluation set to which it belongs, and determines the ranking of alternative schemes. S17: Select the current optimal hydropower cluster sending scheme. S18: Does the system meet the security and stability constraints? S19: Can it pass the serious fault check? 20: Is the channel constraint satisfied? S21: Delete the current solution in the candidate library. S22: Are there alternatives in the alternative library? S23: Can the development scale and commissioning sequence of hydropower clusters be optimized? S24: Under constrained boundary conditions, optimize the development scale and commissioning sequence of hydropower clusters. S25: Optimize partition balance and change power flow direction. S26: Analyze and calculate the clean energy utilization rate of each planning level year; S27: Determine whether the clean energy utilization rate constraint is satisfied? S28: Form a hydropower cluster transmission scheme; S29: Obtain an optimization scheme for the hydropower cluster transmission network structure based on the existing grid channels.

Description

technical field [0001] The invention belongs to the field of power grids, and relates to an optimization method for a grid transmission grid of a hydropower cluster considering the utilization rate of clean energy. Background technique [0002] At present, domestic research on cascade hydropower has been carried out initially, but the research mainly focuses on various coordination and optimization scheduling methods in the operation process of cascade hydropower. [0003] Patent [1] proposes a scheduling method of cascade hydropower "virtual pumped-storage power station", with the minimum deviation between actual and target peak shaving power and the minimum water consumption of cascade hydropower as the scheduling goals, to construct cascade hydropower "virtual pumped-storage power station" scheduling. The objective function is used to solve the optimal scheduling, in order to realize the short-term scheduling plan of the power system; [0004] Patent [2] discloses an ada...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/06
CPCG06Q10/04G06Q10/06393G06Q50/06Y02E40/70Y04S10/50
Inventor 路亮魏明奎周泓黄媛
Owner 国家电网有限公司西南分部
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products