Substation telecontrol signal power failure reset device and system

A reset device and substation technology, applied in circuit devices, emergency protection devices with automatic disconnection, emergency protection circuit devices, etc., can solve problems such as increasing the workload of operation and maintenance personnel, frequent abnormal signal generation, and inability to monitor the situation in the station. Achieve the effect of reducing nighttime workload, improving the quality and efficiency of operation and maintenance work, and reducing traffic risks

Active Publication Date: 2021-09-21
MIANYANG POWER SUPPLY COMPANY STATE GRID SICHUANELECTRIC POWER
View PDF11 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, the on-duty mode of the substation is an unattended substation. The operation of the power grid is highly dependent on the remote communication screen in the main control room and other secondary protection devices for station-side communication. In the actual work process, the secondary protection device will crash after running for a long time , causing communication interruption in the substation, the monitoring department cannot monitor the situation in the station. At this time, the operation and maintenance personnel need to start from the station to go to the communication interruption power station to reset the signal. Due to the large number of secondary equipment, abnormal signals are frequently generated, which aggravates the operation and maintenance personnel. workload

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Substation telecontrol signal power failure reset device and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0049] Such as figure 1 As shown, the substation telecontrol signal power failure reset device includes contact terminals, relay JDQ, drive circuit, controller, and communication module;

[0050] Every 2 empty nodes in the contact terminals form a group of signal terminals, and the output circuit of the relay JDQ is used to connect in series with the main power circuit of the reset equipment at the substation site through the 2 empty nodes of each group of signal terminals; the output circuit of the relay JDQ is configured as normally closed;

[0051] The input circuit of the relay JDQ is configured to be controlled by the driving circuit;

[0052] the drive circuit is configured to be controlled by the controller;

[0053] The communication module is configured to forward the reset control data to the controller;

[0054] The controller includes processor CPU, memory Arm,

[0055] The memory Arm stores a computer program, and when the computer program is executed by the pro...

Embodiment 2

[0077] Such as figure 1 As shown, a substation telecontrol signal power failure reset system includes:

[0078] As in any one of claims 1-4, the substation remote control signal power failure reset device,

[0079] The substation site is restored to the equipment,

[0080] The main power circuit of the equipment to be reset on the substation site is connected in series with the output circuit of the relay JDQ of the substation remote signal power failure reset device through two empty nodes of a group of signal terminals of the substation remote signal power failure reset device.

[0081] The on-site reset device of the substation is a substation on-site protection device or\and a substation on-site measurement and control panel or\and a substation on-site main control room telecontrol communication panel.

[0082] Also includes:

[0083] server, handheld terminal,

[0084] The server is configured to interact with the handheld terminal, and the server is configured to int...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a substation telecontrol signal power failure reset device and system; the output circuit of the relay JDQ is used to connect in series with the main power circuit of the equipment to be reset in the substation site through two empty nodes of each group of signal terminals; the output circuit of the relay JDQ is The configuration is normally closed; the input circuit of the relay JDQ is configured to be controlled by the drive circuit; after the controller receives the time interval of the opening and closing action in the reset control data, it generates the first moment according to the time interval of the opening and closing action. T1 corresponds to the first control signal sent to the drive circuit, and the second control signal corresponds to the first time T2 and sent to the drive circuit. After receiving the first control signal, the drive circuit controls the relay JDQ input loop to be energized, and the drive circuit receives the second After the control signal, the input circuit of the control relay JDQ is powered off; wherein, the time interval between the first moment T1 and the second moment T2 is the same as the time interval between opening and closing actions.

Description

technical field [0001] The invention relates to the field of power grid equipment monitoring, and mainly relates to a power failure reset device and system for a substation telecontrol signal. Background technique [0002] At present, the on-duty mode of the substation is an unattended substation. The operation of the power grid is highly dependent on the remote communication screen in the main control room and other secondary protection devices for station-side communication. In the actual work process, the secondary protection device will crash after running for a long time , causing communication interruption in the substation, the monitoring department cannot monitor the situation in the station. At this time, the operation and maintenance personnel need to start from the station to go to the communication interruption power station to reset the signal. Due to the large number of secondary equipment, abnormal signals are frequently generated, which aggravates the operatio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H02J13/00H02H7/22H02H3/06H02H1/06
CPCH02J13/00002H02J13/0004H02H7/22H02H3/06H02H1/06Y02E60/00Y04S10/20Y04S10/16Y04S40/126
Inventor 邓选民尹伟余伟陈绍忠张敬尧余银陈浩
Owner MIANYANG POWER SUPPLY COMPANY STATE GRID SICHUANELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products