Municipal engineering sludge treatment equipment
A sludge treatment and engineering technology, applied in sludge treatment, water/sludge/sewage treatment, dehydration/drying/concentrated sludge treatment, etc., can solve the problems of high energy consumption and insufficient water removal, and achieve drying The effect of fast drying, sufficient water removal and energy saving
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] see Figure 1~3 , in an embodiment of the present invention, a municipal engineering sludge treatment equipment includes a base 1, a static filter water tank 2 is installed above the base 1, and a permeable layer 201 is arranged at the bottom of the static filter water tank 2. The right side of the static water filter tank 2 is detachably equipped with a cover plate 202, the cover plate 202 is connected with the static filter water tank 2 through a plurality of screws, and the bottom left end of the static filter water tank 2 is connected to the base through the telescopic leg 7 1 connected, the bottom right end of the static filter tank 2 is welded with a snap ring 4, the first rotating shaft 5 is installed in the snap ring 4, and the first rotating shaft 5 is connected with the base 1 through the fixed leg 6, the A flattening mechanism 3 extending to the inside of the static water filter tank 2 is installed. A water storage tank 9 is installed on the base 1 below the ...
Embodiment 2
[0022] see Figure 1~2 , in the embodiment of the present invention, the flattening mechanism 3 includes: a first motor 301, a connecting rod 302, a gear 303, a rack 304, a T-shaped slide 305, and a flattened plate 306, and the T-shaped slide 305 is installed on a static filter On the side of the water tank 2, the static filter tank 2 is provided with a second chute 204 for the sliding of the T-shaped slide plate 305, the first motor 301 is installed on the T-shaped slide plate 305, and the output of the first motor 301 The shaft is connected to the connecting rod 302 through a coupling, and the static filter tank 2 is provided with a first chute 203 for the moving of the connecting rod 302, and a gear 303 is respectively installed at both ends of the connecting rod 302. The gear 303 is connected with the connecting rod 302 through a flat key, and a rack 304 which rotates with the gear 303 is respectively installed on both sides of the static filter tank 2, and the rack 304 is...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 