A large-span cable crane demolition construction method adjacent to the railway business line
A construction method and business line technology, applied in the direction of cable cranes, clockwork mechanisms, load hanging components, etc., to ensure the safety of demolition, reduce unstable factors, and have a small effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0040] refer to Figure 1-23 , a construction method for dismantling a large-span cable hoist adjacent to a railway business line according to the present invention will be described in detail.
[0041] A large-span cable crane demolition construction method adjacent to the railway business line is characterized in that it comprises the following steps:
[0042] Step 1: First remove the hoisting rope 1. Before removing the hoisting rope 1, move the cable hook 2 and the crane 3 to the inspection platform on the top of the near-end tower 4, and first connect the hoisting rope 1 to the near-end tower. The frame 4 is connected with a steel wire rope to prevent slipping, and the pulley block 6 matched with the hoisting rope 1 is removed, and then the hoisting rope 1 is connected with the hoisting rope of the first hoist at the top of the near-end tower frame 4, and the first hoist is a 5T hoist , to disconnect the hoisting rope 1 and the near-end tower 4 is to untie the steel wire...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com