Embedded structure for high pile foundation
A technology for foundation piles and fixed structures, which is applied in foundation structure engineering, sheet pile walls, buildings, etc., can solve problems such as the inability to realize the simultaneous deployment of auxiliary fixed structures, the low fixing efficiency, and the inability to realize the organic combination of steel frame protective structures. , to achieve the effect of improving convenience, improving smoothness, and improving anti-corrosion protection
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0034] as attached figure 1 To attach Figure 8 As shown, the embedded structure for the high pile foundation according to the preferred embodiment of the present invention includes a steel frame 1 , a prefabricated pipe 2 , a fixing structure 3 and a second fixing structure 4 . Wherein, the reinforced frame 1 is sleeved in the prefabricated pipe 2, and the tail ends of the reinforced frame 1 and the prefabricated pipe 2 are inserted into the soil, and the reinforced frame 1 is poured with cement. The outer wall of the prefabricated pipe 2 is sleeved with a fixed structure 3, and the fixed structure 3 is also inserted in the soil, and the fixed structure 3 is inserted with a second fixed structure 4. Reference as Figure 5 and Figure 7 , the second fixing structure 4 includes fixing pins 403, and there are two fixing pins 403, and the two fixing pins 403 are respectively plugged on the fixing plate A 301 and the fixing plate B 302; the two fixing pins 403 are also connecte...
Embodiment 2
[0036] as attached figure 1 To attach Figure 8 As shown, the embedded structure for the high pile foundation includes a steel frame 1 , a prefabricated pipe 2 , a fixed structure 3 and a second fixed structure 4 . Wherein, the reinforced frame 1 is sleeved in the prefabricated pipe 2, and the tail ends of the reinforced frame 1 and the prefabricated pipe 2 are inserted into the soil, and the reinforced frame 1 is poured with cement. A fixed structure 3 is sleeved on the outer wall of the prefabricated pipe 2, and the fixed structure 3 is also inserted into the soil, and a second fixed structure 4 is inserted on the fixed structure 3. Reference as Figure 5 and Figure 7 , the second fixing structure 4 includes fixing pins 403, and there are two fixing pins 403, and the two fixing pins 403 are respectively plugged on the fixing plate A301 and the fixing plate B 302; the two fixing pins 403 are also connected with the prefabricated tube 2 and the steel frame 1 are plugged t...
Embodiment 3
[0040] Reference as Figure 8 , the two fixed sleeves 303 are semi-circular structures, and the two fixed sleeves 303 are equal in size; the bottom surfaces of the two fixed sleeves 303 are all chamfered, so that the smoothness of the fixed sleeves 303 when inserted into the soil can be improved.
[0041] Reference as Figure 5 and Figure 6 , the fixed structure 3 also includes a fixed claw 304, a bottom claw 30401 and a protrusion 30402. There are four fixed claws 304 in total, and the left two fixed claws 304 are welded on the bottom surface of the fixed plate A301, and the right two fixed claws 304 is welded on the bottom surface of the fixed plate B302; the fixed claw 304 is composed of two bottom claws 30401, and the two bottom claws 30401 are welded with protrusions 30402 in a rectangular array, and the heads of the two bottom claws 30401 are pointed structure, so that on the one hand, the smoothness of the bottom claw 30401 can be improved when it plunges into the so...