Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A kind of high ground stress weak surrounding rock tunnel support structure and construction method thereof

A technology of weak surrounding rock and supporting structure, applied in the direction of tunnel, tunnel lining, earthwork drilling and mining, etc., can solve the problems of reduced supporting effect, loss of supporting effect, abnormal change of weak surrounding rock, etc., to avoid rapid expansion and ensure windproof. Sealing and stabilization, increased toughness and mechanical strength

Active Publication Date: 2022-07-26
浙江省衢州市交通建设集团有限公司
View PDF0 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The purpose of the present invention is: in order to solve the existing supporting structure for the weak surrounding rock tunnel with high ground stress, there are still some deficiencies. When the inside of the weak surrounding rock changes, the supporting effect of the bolt will be greatly improved In severe cases, the support effect will be lost, resulting in the weakening of the stability of the entire tunnel support structure to a large extent, and when some weak surrounding rocks change, feedback cannot be given in time, and weak surrounding rocks are prone to occur. In view of the problem of large-scale variation, a support structure and construction method for tunnels with high ground stress and weak surrounding rocks are proposed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of high ground stress weak surrounding rock tunnel support structure and construction method thereof
  • A kind of high ground stress weak surrounding rock tunnel support structure and construction method thereof
  • A kind of high ground stress weak surrounding rock tunnel support structure and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0037] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

[0038] see Figure 1-5 , the present invention provides a technical solution: a high ground stress weak surrounding rock tunnel support structure, including the weak surrounding rock 1 and the intelligent control circuit 26 set on one side of the weak surrounding rock 1, the internal embedded connection of the weak surrounding rock 1 There is a threaded bolt 2, and the position of the inner arc surface of the weak surrounding rock 1 ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a high ground stress weak surrounding rock tunnel support structure and a construction method thereof, belonging to the technical field of traffic engineering facilities. A threaded bolt is embedded in the interior, and a surrounding rock sealing layer is poured on the inner arc surface of the weak surrounding rock corresponding to the position of the threaded bolt, and the threaded bolt is located in the sealing layer buffer opening opened on the surface of the surrounding rock sealing layer. In the present invention, through the designed mutual cooperation among the surrounding rock sealing layer, water barrier, buffer pad, inner support body, torsion spring, threaded bolt, first nut and second nut, the weak surrounding rock can be avoided. The mutation expands rapidly, and with the cooperation of the surrounding rock sealing layer and the water barrier layer, the surrounding rock sealing layer has the ability of windproof sealing and stability to the weak surrounding rock, and the water barrier layer can prevent the water in the weak surrounding rock from seeping and Erosion of tunnels.

Description

technical field [0001] The invention belongs to the technical field of traffic engineering facilities, and in particular relates to a tunnel support structure with high ground stress and weak surrounding rock and a construction method thereof. Background technique [0002] High in-situ stress is a geological concept that refers to the ratio of rock compressive strength to in-situ stress. High in-situ stress does not mean that the horizontal in-situ stress is greater than the vertical in-situ stress. In practice, people often understand that the horizontal in-situ stress is greater than the vertical in-situ stress as high in-situ stress. [0003] Weak surrounding rock generally refers to the surrounding rock with weak rock quality, low bearing capacity, developed joints and fissures, and broken structure. The rock mass structure surface is weak and easy to collapse; the characteristics of the weak surrounding rock determine its deformation characteristics in the process of ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D11/10E21D11/38E21D11/00E21D20/00E21D21/00E21F17/18
CPCE21D11/10E21D11/38E21D11/00E21D20/00E21D21/0026E21F17/185
Inventor 申锦文童建龙姚斌江王伟郑文辉
Owner 浙江省衢州市交通建设集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products