Riverway drainage basin flood prevention dam construction method

A construction method and watershed technology, applied in sea area engineering, embankment, excavation, etc., can solve the problems of easy damage to slopes, tidal flat protection construction, etc., and achieve the effects of avoiding collapse, long service life, and improving integrity

Inactive Publication Date: 2020-10-16
上海河道建设有限公司
View PDF8 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The above-mentioned existing technical solutions have the following defects: directly excavate the tidal flat in front of the flood control wall, install fixed piles and fixed formwork, and then start pouring concrete. Before the construction of concrete, the tidal flat is not protected. The sediment is washed and transported with the water flow before the concrete is poured, and the excavated slope is easily damaged

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0036] Embodiment: for the construction method of a kind of river basin flood control embankment disclosed by the present invention, before constructing concrete, to the slope construction before the flood control wall construction beach protection project, the step of beach protection project is as follows:

[0037] S1, clean up the river silt, and level the slope in front of the flood control wall;

[0038] S2, set-out positioning, excavate the boundary of the slope, and process the trench;

[0039] S3. Throwing polypropylene filament woven fabric before the flood control wall, and then throwing and filling rocks to make the slope reach 1:2.5. On the slope surface, the particle size of stones selected for riprap is 15-45cm, and the material is hard and difficult to hydrolyze;

[0040] S4, use net gabion foot protection at the foot of the slope, use bagged gravel to level the top of the riprap, and then use film bag concrete to protect the surface. Filling, the material of ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Particle sizeaaaaaaaaaa
Login to view more

Abstract

The invention relates to the technical field of dam construction, in particular to a riverway drainage basin flood prevention dam construction method. The method comprises the following steps that before concrete construction, beach protection project is conducted on the slope surface in front of a flood prevention wall, wherein the beach protection project comprises the following steps that S1, silt is removed, and the slope surface in front of the flood prevention wall is flattened; S2, paying-off positioning is conducted, the border of the slope surface is dug, and a groove is processed; S3, polypropylene filament yarn woven cloth is thrown in front of the flood prevention wall at first, then, rubble is thrown for filling, the gradient of the slope reaches 1:2.5; and S4, net bag gabionsare adopted at the toe of the slope to protect the toe, leveling of the upper portion of the thrown rubble is achieved with bagged broken stone, and the surface is protected through film-bagged concrete. Before concrete construction, the slope surface is protected through the beach protection project, the soil and water loss situation is avoided, the integrity of the slope surface is improved, and the water ecology of the slope surface is stabilized and protected from being damaged.

Description

technical field [0001] The invention relates to the technical field of dam construction, in particular to a construction method for flood control dams in river basins. Background technique [0002] my country has a vast territory and many rivers and lakes. Flooding often occurs in some river basins. People often use dikes to prevent floods. Building dikes has become the main measure to prevent flooding, protect residents and industrial and agricultural production. , the function of the embankment is to limit the flood in the flood channel, increase the water depth of the same flow rate, increase the flood velocity, and facilitate flood discharge and sediment discharge. [0003] In the prior art, in a Chinese patent document with the authorized announcement number CN104164877B, a method for underwater concrete construction at the embankment slope foot is recorded, which includes the following steps: (1) Excavating the section at the designed warehouse position, During the exc...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02B3/10E02B3/12E02D17/04E02D5/26
CPCE02B3/10E02B3/12E02B3/122E02B3/123E02B3/128E02D5/26E02D17/04E02D2300/0071Y02A10/11Y02A10/30
Inventor 俞钢徐美洲任东杰
Owner 上海河道建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products