Construction method for restraining floating-up amount of shield tunnel segments
A technology of shield tunnel segment and construction method, which is applied in the field of shield tunnel segment construction, can solve the problem that the initial setting time cannot be guaranteed, and achieve the effects of reducing the floating amount of segment, convenient operation and simple material.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0018] It should be noted that, in the case of no conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other.
[0019] In the description of the present invention, it should be noted that if the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" appear ", etc., are only for the convenience of describing the present invention and simplifying the description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be construed as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and should not be understood as indicating or implying relative importance.
[0020] In the description of the present invention, it should be noted that, unless otherwise specified and limited, terms such a...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More