A Groundwater Treatment Method for Underground Excavation Construction in Composite Stratum Under Existing Buildings
A technology of existing buildings and composite strata, applied in the field of groundwater treatment, can solve problems such as poor feasibility, high demolition cost, and difficult coordination, and achieve the effects of avoiding demolition, speeding up the progress, and saving project costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] Pengcheng Square Station of Xuzhou Line 1 is an open-concealed excavation and separation island station, and part of the platform layer is an excavation and separation island type station. It is located directly below the existing fashion avenue, and is constructed using the CRD underground excavation method. Fashion Avenue is a business with one basement and some two floors, with a total construction area of more than 13,000 square meters, and most of the shops are owned by individuals; the underground commercial street of Fashion Avenue takes into account the crossing functions of the four quadrants at the intersection of Huaihai Road and Zhongshan Road. Located in the commercial center of Xuzhou City, the passenger flow is very large, and the coordination of demolition and relocation is extremely difficult. According to the conventional design, it is impossible to construct a dewatering well in the existing structure, and it is also impossible to set a dewatering we...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 