Supercharge Your Innovation With Domain-Expert AI Agents!

Steel guide wall used for secant pile hole construction

A technology of occlusal piles and hole forming, which is applied in artificial islands, water conservancy projects, infrastructure projects, etc., can solve the problems of high construction cost, easy damage, and reinforced concrete structures that cannot be reused.

Pending Publication Date: 2020-10-23
CHINA MCC5 GROUP CORP
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, in the construction of occlusal piles, in order to ensure accurate positioning of occlusal piles, mutual occlusal, control the occlusal depth between piles, and meet the construction quality requirements, before drilling occlusal piles, construct the guide wall according to the designed pile position and axis. Control the pile position, pile axis, occlusal depth, etc. Generally, the guide wall adopts a 200mm thick, C30 plate-type reinforced concrete structure, which is easily damaged during construction, and the reinforced concrete structure cannot be reused, and the construction cost is high. unwanted

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Steel guide wall used for secant pile hole construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] The invention discloses a steel guide wall for hole-forming construction of occlusal piles, which comprises two longitudinal beams arranged oppositely; at least four positioning hole groups are arranged at equal intervals on the two longitudinal beams, and each of the Each positioning hole group includes at least three positioning holes, and the positioning holes on the two longitudinal beams are arranged in one-to-one correspondence, and at least four limit beams are connected between the two longitudinal beams corresponding to the positioning hole groups, And the position-limiting beam is connected to the longitudinal beam through a positioning hole by a fastener; the outer sides of the two longitudinal beams are fixedly provided with anchor piles, and the tops of the anchor piles are fixed by connecting pieces on the stringer.

[0018] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but not...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of building construction, in particular to a steel guide wall used for secant pile hole construction. At least four locating hole groups are arranged on two oppositely arranged longitudinal beams in an equally spaced manner; each locating hole group comprises at least three locating holes; at least four limiting cross beams are connected to positions, corresponding to the locating hole groups, between the two longitudinal beams to surround at least three square holes; by using fastening pieces, the limiting cross beams are connected to the longitudinal beams through a locating hole; anchor piles are fixedly arranged on the external sides of the two longitudinal beams; and therefore, during secant pile hole construction, a purpose of enabling secant pile hole to be located and occluded with each other is realized only by using the anchor piles to fix the steel guide wall on the operation ground, and then using the square holes to form first secant pile holes in a spaced manner and adjusting the limiting cross beams to be tightly connected with different locating holes in the locating hole groups to form second secant pile holes between the adjacent first secant pile holes.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a steel guide wall used for hole-forming construction of occlusal piles. Background technique [0002] At present, in the construction of occlusal piles, in order to ensure accurate positioning of occlusal piles, mutual occlusal, control the occlusal depth between piles, and meet the construction quality requirements, before drilling occlusal piles, construct the guide wall according to the designed pile position and axis. Control the pile position, pile axis, occlusal depth, etc. Generally, the guide wall adopts a 200mm thick, C30 plate-type reinforced concrete structure, which is easily damaged during construction, and the reinforced concrete structure cannot be reused, and the construction cost is high. Unwanted to see. Contents of the invention [0003] Aiming at the above-mentioned problems, the present invention discloses a steel guide wall for occlusal pil...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D17/04E02D29/02
CPCE02D17/04E02D29/02E02D2300/0029
Inventor 李骏文果习树信
Owner CHINA MCC5 GROUP CORP
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More