Method for replacing bridge support

A technology for bridge bearings and replacement methods, applied in bridges, bridge parts, bridge maintenance, etc., can solve problems such as non-standard design of pad stones, only shallow holes can be drilled, and the hole depth cannot meet the requirements of connection strength, etc. To achieve the effect of not weakening the structural strength and anchoring strength of the bridge, reducing the investment of construction equipment and personnel, reducing the difficulty and replacement cost

Active Publication Date: 2020-10-30
SICHUAN XIANGHUI ROAD & BRIDGE ENG CO LTD
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This traditional replacement method has the following defects: (1) Since the old bridge bearings connected by exposed anchor rods are a series of standard products, when the specifications of the bearings are small and medium, the height H of the bearings is low, and at the same time, the pad stone design is not According to the standard, there is a lack of pad stone or low pad stone height, which will result in a small vertical operating space when replacing the bridge support, and it is impossible to drill holes on the bottom surface of the beam body or the top surface of the pad stone, or only shallow drilling can be performed. (2) Due to the bridges built in the early stage, the arrangement of beams, pad stones, and abutments often deviated from the position required by the design, and it was difficult to avoid the affected area when drilling. When the stressed steel bar is drilled and damaged, and when the stressed steel bar is encountered during drilling, a large vibration will be generated, or after the stressed steel bar is drilled, the strength of the reinforced concrete will be weakened and reduced; (3 ) It is necessary to avoid the old bridge support anchor rod when drilling, otherwise the drill bit will be damaged and the strength of reinforced concrete will be seriously weakened. When drilling in the old support anchor rod plane contour line, the support will be displaced The phenomenon of interference and movement of parts and components, and, in order to ensure the design strength of the support, generally speaking, the plane position of the drilling hole cannot be moved inward; when drilling outside the plane contour line of the old support anchor rod, There will be phenomena that the plane contour of the pad stone is too close to the drilling position, and the drilling position is outside the plane contour of the pad stone. Sometimes, the drilling position at the end of the beam body will exceed the edge of the contour. These phenomena need to be padded and Beam end strengthening treatment; (4) The design of the new bridge support needs to be confirmed according to the drilling position or height of the on-site construction, which increases the design and manufacturing cycle of the new bridge support and cannot meet the urgent replacement schedule requirements

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0023] The replacement method of the bridge bearing provided in this embodiment is aimed at the replacement of DX and SX movable bearings, and includes the following steps:

[0024] (1) New bridge support preparation, according to the size of the old bridge support and the connection size and height of the bridge support in the national standard, the new bridge support is designed and manufactured in advance, and the inlay sleeve matching the anchor rod is made; because the old bridge support is used The anchorage system of the bridge support, so the design of the new bridge support can be carried out according to the size data of the old bridge support when it is installed;

[0025] (2) Preparation for disassembly, first remove the nuts of the fastened upper and lower anchor rods, and then lift the beam body according to the designed jacking amount. According to different bridges, the jacking amount is generally controlled at 5mm-20mm;

[0026] (3) The old bridge support is d...

Embodiment 2

[0032] The replacement method of the bridge support provided in this embodiment is aimed at the replacement of the fixed support, including the following steps:

[0033] (1) New bridge support preparation, according to the size of the old bridge support and the connection size and height of the bridge support in the national standard, the new bridge support is designed and manufactured in advance, and the inlay sleeve matching the anchor rod is made; because the old bridge support is used The anchorage system of the bridge support, so the design of the new bridge support can be carried out according to the size data of the old bridge support when it is installed;

[0034] (2) Preparation for disassembly, first remove the nuts of the fastened upper and lower anchor rods, and then lift the beam body according to the designed lifting amount. According to different bridges, the jacking amount is generally controlled at 9mm-12mm;

[0035] (3) After dismantling the old bridge suppor...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for replacing a bridge support. The method comprises the following steps: (1) designing and manufacturing a new bridge support and an embedding sleeve in advance; (2)after nuts for fastening anchor rods are disassembled, jacking a beam body; (3) horizontally cutting an exposed upper anchor rod along the bottom surface of an upper seat plate of an old bridge support, then cushioning a lower seat plate of the old bridge support away from a padstone, horizontally cutting the exposed lower anchor rod along the surface of the padstone after cushioning, and sequentially taking down a middle body, the lower seat plate and the upper seat plate of the old bridge support after cutting; (4) after the old bridge support is taken out, allowing a beam to fall down and serve as a temporary support, forming a groove in a padstone anchor rod, and performing outer circle repairing on the upper anchor rod and the lower anchor rod; and (5) mounting the new bridge support.According to the method, the replacement is carried out under the condition that the plane connecting position and height of the old bridge support are not changed, the anchoring system of the old bridge support is fully utilized for anchoring connection after replacement, the structural strength and anchoring strength of the bridge are not weakened, the replacement cost is effectively reduced, and the construction period is shortened.

Description

technical field [0001] The invention belongs to the technical field of building construction, and in particular relates to a method for replacing a bridge support. Background technique [0002] The bridge bearing is an important support in the bridge structure, commonly known as the "joint" of the bridge structure, which transmits various loads on the upper part of the bridge structure, including the dead load gravity of the beam body itself, vehicle live load and braking force, temperature expansion force, wind force, earthquake force and impact force, etc.; it is also suitable for various translational linear displacements and rotational angular displacements of the beam due to temperature changes and live load changes. [0003] From the early 1980s to the end of the last century, a large number of poorly replaceable bearings were used in bridge structures in my country, including PZ, GPZ series pot bearings and QZ series spherical bearings. Severe corrosion, rubber aging,...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D22/00E01D19/04
CPCE01D22/00E01D19/04
Inventor 欧阳先凯李陆蔚李庆择周家刚罗启吴静龙波欧阳先敏
Owner SICHUAN XIANGHUI ROAD & BRIDGE ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products