Pipeline groove excavation construction method
A construction method and technology for pipeline trenches, which are used in excavation, infrastructure engineering, soil protection, etc., can solve the problems of increasing engineering volume and high material cost, and reduce the depth of excavation, improve stability, and improve density and hardness. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] The present invention will be described in further detail below in conjunction with the accompanying drawings.
[0040] refer to figure 1 , is a kind of pipeline trench excavation construction method disclosed by the present invention, and described method comprises the following steps:
[0041] S1: Measurement and setting out: According to the coordinates of the designed sewage pipe and the grading coefficient of the pipeline construction face, measure and set out the excavation sideline of the excavator; the measurement control point must be introduced from the traverse point that has been reviewed in this project, and the temporary control point must pass through Use after supervision review. Consider according to 1:0.5 grading.
[0042] S2: Trench excavation: Dig to the bottom of the trench according to the slope coefficient of the soil slope; the earthwork on the trench is carried out by ordinary PC200 excavator, and the excavated earthwork is directly transporte...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com