The utility model relates to the technical field of underground
engineering waterproofing, and discloses a shield well permanent and temporary combination ring frame beam and side wall multi-stage grouting composite waterproof structure which comprises an underground diaphragm wall body, a permanent and temporary combination ring frame beam body and a side wall body. According to the shield well permanent and temporary combined ring frame beam and side wall multi-stage grouting composite waterproof structure, the PVC waterproof coiled material adopts the specification with the thickness larger than or equal to 1.5 mm, a three-stage continuous sealing layer is formed by the PVC waterproof coiled material, the
polysulfide sealant and the
water stop belt through the sweat
soldering technology, the underground water
permeation path is effectively blocked, the joint
leakage rate is remarkably reduced, the galvanized grouting steel
pipe is pre-buried in the DN specification, and therefore the construction efficiency is improved. The galvanized grouting steel
pipe works cooperatively with the repeatable grouting
pipe, through the multi-round grouting technology of single-liquid
cement paste, full compaction of a
cement paste filling layer is achieved, the leakage risk of structural joints and cavities is thoroughly eliminated, and the galvanized grouting steel pipe creatively has the dual functions of underground water guide and drainage in the construction period and permanent anti-seepage grouting. Precise regulation and control of the grouting process are achieved through a
ball valve control system.