A construction method for anchor grooves of prestressed steel-concrete composite beams
A technology of prestressed steel and construction method, applied in bridges, bridge construction, bridge parts and other directions, can solve problems such as affecting the progress and quality of the project, difficult to take out the wooden formwork, difficult to locate the reserved reinforcement holes, etc. Ease of implementation and high quality construction results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but it should not be used as a basis for limiting the present invention. The content not described in detail in the present invention is common knowledge in the art.
[0030] See attached Figure 1-5 , the prestressed steel-concrete composite beam anchor groove construction method of the present invention is: before pouring the bridge deck concrete, the prefabricated sulfur mortar anchor groove prefabricated block 3 prepared in advance is installed on the steel beam 1, and then the bridge deck concrete pouring; on the prefabricated block 3 of the sulfur mortar anchor groove, corresponding to the shear stud 5 fixed on the steel beam 1 (the shear stud 5 is usually welded on the steel girder 1), a group of shear studs whose ports are located on the bottom surface are provided. Force nail insulation sleeve 303; the inside of the sulfur mortar anchor...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


