Unlock instant, AI-driven research and patent intelligence for your innovation.

Road surface concrete construction mold and construction method thereof

A concrete and surface layer technology, applied in the direction of roads, roads, road repairs, etc., can solve the problems that it is difficult to ensure the verticality and straightness of the formwork, the construction joints are not straight, the formwork is inclined or settled, and the quality of the road is achieved. Stability, broad application prospects, simple and convenient process

Inactive Publication Date: 2021-01-29
CHINA NUCLEAR IND HUAXING CONSTR
View PDF10 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The construction process of this formwork is relatively simple, but the construction quality is unstable, and there are many construction shortcomings: First, the quality is seriously affected by human factors. Specifically, the inside of the formwork is not fixed, but only the outer steel bar and wood. It is difficult to guarantee the verticality and straightness of the formwork, and under the action of external force or construction gravity, the formwork may also tilt or settle, which affects the construction quality, and the quality of the joints is related to the technical level and working attitude of the construction workers. There is a direct relationship, and the influence of human factors is greater; second, the overall stability of the formwork is poor. Specifically, the formwork is an independent body, and each is independently stressed. The effect of vibration, or when the upper surface of the roller (or grinder) is squeezed, it is easy to cause the individual formwork to be deformed or tilted to varying degrees, resulting in poor surface smoothness of the road surface concrete, large differences in elevation, Construction joints are not straight and other quality problems and perception problems

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Road surface concrete construction mold and construction method thereof
  • Road surface concrete construction mold and construction method thereof
  • Road surface concrete construction mold and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] Embodiments of the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0025] Such as Figure 1~5 As shown, a road surface concrete construction mold of the present invention includes a vertical positioning rod 1 and an assembled channel steel. The assembled channel steel is formed by butting the channel steel 2 through a socket-type component left and right, and the socket-type component includes a left Positioning plate 5-1, right positioning plate 5-2 and socket-type horizontal movable steel plate 5-3, left positioning plate 5-1 is a square steel plate, right positioning plate 5-2 is a wedge-shaped steel plate, and the upper end of the wedge-shaped steel plate is from left to right Gradually descending, the left positioning plate 5-1 and the right positioning plate 5-2 are fully welded to the left and right ends of the lower flange plate of the channel steel 2 respectively, and the U-shaped steel plate 4-1 is d...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a road surface concrete construction mold and a construction method thereof, assembled channel steel is formed by left-right butt joint of channel steel through socket and spigot joint members, separation joint template reserved inserting holes and longitudinal locking pieces are uniformly distributed on the inner side and the outer side of the channel steel respectively, and the assembled channel steel is fixed to vertical positioning rods through the longitudinal locking pieces in a height-adjustable mode; the vertical positioning rod is vertically fixed on a road base. Two pieces of channel steel are horizontally connected into a whole in a butt joint mode through the socket type component, the left channel steel and the right channel steel slide up and down along the vertical positioning rod through the U-shaped steel plate and are fixed to the vertical positioning rod in a height-adjustable mode through limiting of the wedge-shaped fixing pins directly penetrating through the U-shaped steel plate, and vertical fixing and elevation of the left channel steel and the right channel steel are achieved. The road surface concrete construction mold is detachable, separation joint templates are reserved on the inner sides of the left channel steel and the right channel steel for reserving insertion holes, separation joints can be formed through one-time construction, the process is simple and convenient, the road forming quality is stable, work efficiency is greatly improved, the channel steel model can be freely selected, and the mold can be well suitable for road surface concrete construction of different thicknesses.

Description

technical field [0001] The invention relates to a construction tool for construction, in particular to a road surface concrete construction mold and a construction method thereof. Background technique [0002] Roads are divided into highways, urban roads, country roads, factory and mine roads, forestry roads, workshop passages, and school roads according to their use characteristics; with the development of society, concrete roads are widely used in suburban municipal roads and factory roads. The quality requirements are getting higher and higher. The concrete surface construction of municipal roads and factory roads usually adopts steel formwork to set the formwork, and mainly adopts the form of the main panel (I-beam) and fixed pillars. The construction process: first, preparation before installation, cleaning the road surface, checking the formwork , check the elevation and slope of the base layer, and perform positioning and setting out; second, apply release agent or r...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01C19/50
CPCE01C19/50E01C19/502
Inventor 陈清华周小丽向飞卢俊生崔炜
Owner CHINA NUCLEAR IND HUAXING CONSTR