A concrete and cable machine technology, applied in the direction of the clockwork mechanism, infrastructure engineering, hoisting device, etc., can solve the problems of time-consuming and labor-intensive, affecting the quality and progress of the project, and the inability to realize small fixed cable machines. The effect of reducing the strength of manual tank support, improving time efficiency and safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The landing anti-swing system of the concrete material tank of the dam construction cable crane includes a feeding positioning mechanism and a traction speed regulating mechanism.
[0029] Such as figure 1 , Figure 4 As shown, the feeding positioning mechanism includes a hardening platform 12, and the hardening platform 12 is formed by pouring concrete. A double-tube winch 5 and two fixed pulleys 8 are installed on the hardening platform 12 , and the first rope 13 is wound on the double-tube winch 5 and looped back through the fixed pulley 8 . Flat tackle 7 bottoms are connected with two first ropes 13 inside, and the flat tackle 7 upper ends are placed with cable machine feed tank 6. When the double-tube winch 5 starts, the cable machine feed tank 6 on the flat block 7 can be driven by two first ropes 13 to move back and forth.
[0030] In addition, a first fortress 2 is built on the hardening platform 12, and the first fortress 2 is inlaid with a hopper 1, and the...