Uplink resource scheduling method and device
A resource scheduling and resource block technology, applied in the field of resource scheduling, can solve the problem of inability to meet low latency, high reliability and large-capacity resource allocation, and achieve the effects of improving reliability and reducing latency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0052] Embodiments of the present invention provide an uplink resource scheduling method and device, which are used to solve the technical problem that traditional uplink resource scheduling methods cannot satisfy resource allocation for different services such as low delay, high reliability, and large capacity.
[0053] There are three major application scenarios for 5G, including eMMB (Enhanced Mobile Broadband, enhanced mobile broadband), uRLLC (Ultra Reliable&Low Latency Communication, low-latency, high-reliability communication) and mMTC (Massive Machine Type Communication, massive Internet of Things communication) . According to time constraints, uRLLC’s business is real-time messaging. In this scenario, it has high requirements for latency, often reaching the 1ms level, such as automatic control of metering collection, real-time collaborative robots, and other real-time monitoring and real-time early warning. Data, if the transmission process of such data takes too long...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com