Packaging and conveying equipment for preparing anticorrosive paint
A technology for anti-corrosion coatings and conveying equipment, applied in the directions of packaging, transportation and packaging, application, etc., can solve the problems of solidification of raw materials on the inner wall of the pipeline, affecting the next use of the pipeline, low wage efficiency, etc., achieving sufficient material preparation, improving efficiency, and operating simple effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] see Figure 1-6 , the present invention provides a technical solution:
[0028] A kind of packaging and conveying equipment for the preparation of anticorrosion coatings, comprising a base 4 and a belt conveyor 5, the top of the base 4 is fixedly connected with a belt conveyor 5, and the left end of the belt conveyor 5 is fixedly connected with a controller 6, the The top of the belt conveyor 5 is provided with a packaging bucket 7, and the top of the packaging bucket 7 is provided with a feeding pipeline 8, and the outside of the feeding pipeline 8 is fixedly connected with a cleaning device 1, and the top of the base 4 is fixedly connected with a A fixed frame 9, the inner side of the fixed frame 9 is fixedly connected with a capping and packaging device 2, and the right end of the capping and packaging device 2 is fixedly connected with an alarm device 3, and the described capping and packaging device 2 includes a storage box 201, a second Two motors 202, adjusting ...
Embodiment 2
[0031] Embodiment 2 and Embodiment 1 will not repeat the same parts. The difference is that when the end cover 10 inside the material storage box 201 is about to be used up, under the action of the second spring 306, the fixing ring 305 carries the guide rod 304 Slide to the left along the first linear bearing 307 and the second linear bearing 308, and at the same time, the guide rod 304 will also carry the pressure plate 303 to squeeze the limit switch 302, so that the limit switch 302 controls the alarm light 309 to give an alarm to the outside. Remind the staff to add the end cap 10 to the inner side of the material storage box 201 in time.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 