Ice-water accumulation body tunnel surrounding rock reinforcing and excavating method under influence of seasonal rainfall and surrounding rock support
An accumulation and seasonal technology, applied in tunnels, earthwork drilling, mining equipment, etc., can solve the problems of waste of engineering cost, lack of engineering experience, and difficulty in ensuring construction safety in water-rich seasons, so as to ensure construction progress and save costs. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0061] Figure 1-7 A method for strengthening the surrounding rock of an ice-water accumulation tunnel under the influence of seasonal rainfall is shown, which includes the following steps:
[0062] S1: Build a grout stop wall 3 in front of the tunnel face;
[0063] S2; Arrange radial grouting conduits 7 on the initial support in the range behind the grouting wall 3 for grouting reinforcement;
[0064] S3: Arrange grouting holes 1 on the grouting wall, and the grouting holes 1 extend to the unexcavated section of the tunnel in front of the grouting wall 3;
[0065] S4: Grouting reinforcement through the grouting hole 1 by means of high-pressure infiltration or compaction or split grouting to form a water-stop curtain for the unexcavated section of the tunnel;
[0066] S5: Construct pipe shed holes on the outer arch of excavation contour line 4;
[0067] S6: setting up the steel pipe 11 for the pipe shed, and performing grouting for the pipe shed;
[0068] S7: Add advanced ...
Embodiment 2
[0083] The present invention also relates to a method for excavating the surrounding rock of an ice-water accumulation tunnel under the influence of seasonal rainfall, which specifically includes the following steps: after the surrounding rock is reinforced by the above-mentioned reinforcement method, temporary cross braces 12 are erected in the tunnel to break the slurry-stop wall 3, Excavation was started using the small-section three-step method.
[0084] Small sections and temporary cross braces can reduce disturbance to surrounding rock.
Embodiment 3
[0086] The present invention also shows the surrounding rock support of the ice-water accumulation tunnel under the influence of seasonal rainfall, including:
[0087] A grout-stop wall 3 located at the face of the tunnel;
[0088] A water-stop curtain that forms a closed space with the grout-stop wall 3 and is located in the unexcavated section of the tunnel;
[0089] A plurality of grouting sections extending from the grout-stop wall 3 to the water-stop curtain, the ends of the grout-fill sections form the pipe side wall and the pipe end wall of the tubular water-stop curtain, and the pipe end wall and the paddle-stop wall 3 close the tubular water-stop curtain both ends;
[0090] A plurality of radial grouting conduits 7 grouting support sections located on the primary support of the tunnel;
[0091] A plurality of pipe shed steel pipes 11 grouting support sections surrounding the outer arch of the tunnel excavation contour line 4;
[0092] Multiple advance small conduit...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com