Socket and spigot type steel pipe scaffold and construction method thereof
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017] Embodiment 1, a kind of socket-type steel pipe scaffolding, such as Figure 1-Figure 3 As shown, it includes a vertical pole 1 with a socket connection. The lower end of the vertical pole 1 is provided with an adjustable base 10, and the upper end is provided with a U-shaped support 11. The vertical pole 1 is covered with a connecting plate 2, and the connecting plate 2 is provided with a Connecting holes that penetrate up and down, horizontal rods 4 and oblique rods 5 are arranged between the connecting discs 2 on the adjacent vertical rods 1, and the two ends of the horizontal rod 4 and the oblique rods 5 are provided with clamping connectors on the connecting discs 2. The buckle joints on the upper and lower sides are provided with through holes corresponding to the connecting holes, and the buckle joints are fixedly connected to the connection plate 2 through the latch 6 .
[0018] The outer edge of the connection plate 2 is circular or regular octagonal, and the bu...
Embodiment 2
[0020] Embodiment 2, a construction method of socket-type steel pipe scaffolding, construction is carried out in the following order: construction preparation→positioning, lofting, discharge adjustable base→installation of vertical poles on the first floor→installation of horizontal poles on the first floor→frame body on the first floor to the surroundings Expansion installation → form an independent unit body → level adjustment of the first floor frame body → installation of the oblique rod on the first floor → pin the horizontal rod and oblique rod latch on the first floor → installation of the climbing work ladder → installation of the pedals on the climbing platform → installation of the vertical rod extension → horizontal rod Installation→slope installation→climbing work ladder installation→climbing platform installation→adjustable bracket installation→main keel installation→process inspection and acceptance→support removal construction.
[0021] Further, the verticality r...