Construction method for reducing blasting vibration of structure close to urban tunnel
A blasting vibration and construction method technology, applied in blasting and other directions, can solve problems such as unsatisfactory safety and stability of nearby structures on the ground, and achieve the effect of reducing the superposition of seismic waves and reducing disturbance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0027] The present invention will be further described below in conjunction with embodiment (accompanying drawing):
[0028] Such as Figure 1~7 Shown, the construction technological process of the construction method of the construction method that reduces urban area tunnel adjacent structure blasting vibration of the present invention is as follows:
[0029] ① Advanced support of double-layer small catheter;
[0030] ② Division of the upper steps of the tunnel;
[0031] ③Excavation by blasting in the middle and lower part of the tunnel;
[0032] ④ Excavation by blasting in the second area of the middle and upper part of the tunnel;
[0033] ⑤ Excavation of the lower part of the tunnel.
[0034] Specific steps are as follows:
[0035] a. During construction, move the cut hole downwards, away from the upper protected structure, and set up double-layer small conduits 3 within the range of 4m before and after the lower penetration section, and advance support with a lengt...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com