Enterprise re-work/re-production rate calculation method and system

A calculation method and technology for production resumption rate, applied in the field of calculation methods and systems for the resumption of production/reproduction rate of enterprises, which can solve the problems of difficult visual display, inability to analyze high-dimensional data, and difficulty in quantitative analysis.

Pending Publication Date: 2021-04-30
国家电网有限公司大数据中心
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In order to solve the problems existing in the existing rate calculation of resumption of work and production, such as the difficulty of quantitative analysis, the inability to analyze high-dimensional data, and the difficulty of visual display, the present invention provides a method for calculating the rate of resumption of work / production of an enterprise: including:

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Enterprise re-work/re-production rate calculation method and system
  • Enterprise re-work/re-production rate calculation method and system
  • Enterprise re-work/re-production rate calculation method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0067] This embodiment takes the Chinese traditional festival Spring Festival, the first day of each year in the Chinese calendar (lunar calendar) as an example to illustrate a kind of enterprise resumption / production rate calculation method involved in the present invention, as figure 1 shown, including:

[0068] S1: Obtain the enterprise resumption / production rate and corresponding date, determine the start date of resumption / resumption, and construct a set of resumption / resumption rate;

[0069] S2: Determine the enterprise resumption / production rate based on the relationship between the start date, the resumption / resumption rate and the corresponding date in the enterprise resumption / resumption rate set;

[0070] The specific implementation method is as follows:

[0071] Variable definitions

[0072] (1) Resumption of work or production index R

[0073] The indicator of resumption of work or production is a quantitative indicator to measure the level of resumption of wo...

Embodiment 2

[0137] In this embodiment, the following general algorithm can be used for unary linear regression and multiple linear regression based on the difference algorithm of resumption of work and production in two years:

[0138] If the regression equation for two years is: y a =X a beta a and y b =X b beta b

[0139] If a specific resumption rate y is given d

[0140] Then the difference X of each independent variable including the number of days d =y d / β a -y d / β b

[0141] If the value of each independent variable X within a given number of days d =[1x d1 … x dp ]

[0142] Then the difference in return to work and production rate y d =y a -y b =X d beta a -X d beta b

Embodiment 3

[0144] In order to realize the above method, the present invention also provides a system for determining the rate of resumption / resumption of production of an enterprise, such as Figure 4 As shown, including: acquisition module, calculation module;

[0145] Among them, the acquisition module is used to: obtain the enterprise resumption / resumption rate and corresponding date, determine the start date of resumption / resumption, and construct a set of resumption / resumption rate;

[0146] The calculation module is used for: determining the enterprise resumption / production rate based on the relationship between the start date, the resumption rate and the corresponding date in the enterprise resumption / resumption rate set.

[0147] Obtain the construction of the resumption / resumption rate set in the module, including:

[0148] Determine the date corresponding to the minimum return to work / production rate from the obtained enterprise return to work / production rate as the start dat...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides an enterprise re-work / re-production rate calculation method and system, and the method comprises the steps: obtaining an enterprise re-work / re-production rate and a corresponding date, determining a start date of re-work / re-production, and constructing a re-work / re-production rate set; and determining the enterprise re-work / re-production rate based on the relationship among the start date, the re-work / re-production rate and the corresponding date in the enterprise re-work / re-production rate set. Therefore, the technical scheme realizes the quantitative analysis of the high-dimensional data of the re-work / re-production rate. Meanwhile, the rework / reproduction rate graph drawn in the technical scheme provided by the invention can achieve visual display.

Description

technical field [0001] The invention relates to the technical field of resumption of work and production after holidays, and in particular to a method and system for calculating the rate of resumption of work / production of an enterprise. Background technique [0002] The analysis of enterprise resumption of work and production is an important means to evaluate the recovery of social and economic activities before and after statutory holidays (including some shutdowns due to major impacts), and the rate of resumption of work and production is an important indicator to measure the speed of recovery of social and economic activities. At present, there are mainly one technical solution for the rate analysis of resumption of work and production: [0003] Rate of resumption of work and production under specific standards: the period from the start of resumption of work to when a certain resumption of work and production indicator reaches a specific threshold such as 30%, 50%, 80%....

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06F17/18G06F17/11G06F17/16
CPCG06F17/11G06F17/16G06F17/18G06Q10/06393
Inventor 万凯李宗朋刘识程志华赵宇亮赵加奎王宏刚林晓静郭敏杨志
Owner 国家电网有限公司大数据中心