Vertical wall sliding installation supporting device and construction method thereof

A sliding installation and support device technology, applied in the field of civil engineering, can solve the problems of increasing the operation cost of wheeled cranes, complex road structure, and complicated conditions

Active Publication Date: 2021-05-28
HENAN UNIV OF URBAN CONSTR
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in the actual operation process, the author found that there are many disadvantages in this method, and these disadvantages are concentrated in: because the steel frame of the vertical wall inevitably needs to be hoisted during the installation process, the current construction method is to put the frame of the vertical wall The assembly is carried out at a position far away from the cave body. After the assembly is completed, use multiple wheeled cranes to transport it to the vicinity of the cave body, and then use crawler cranes to carry out the unloading operation. Due to the small lifting capacity of the wheeled cranes, multiple wheeled cranes are required. Complete the transshipment operation of the steel frame of the vertical wall. Because the crawler crane has a large load capacity and there are many supporting points for lifting the load, the crawler crane is used to carry out the unloading operation after aligning the hole. Because the steel frame of the vertical wall is assembled During the process, it is necessary to stay away from the hole to a safe area and location, and to facilitate the transportation of incoming materials and installation operations. Therefore, the assembly of the vertical wall frame is far away from the hole, which has caused certain defects. If only crawler cranes are used, Because the bottom of the crawler crane is generally required to be stable during construction, if the assembly position of the vertical wall frame exceeds the travel distance of the crawler crane, it is necessary to use multiple wheeled cranes to assist in the transportation of the vertical wall reinforcement frame to the crawler crane. However, in the specific construction process, due to site constraints and construction safety requirements, the assembly of the vertical wall frame must be far away from the design of the opening, which increases the operating cost of the wheeled crane and must be used The combination of wheeled cranes and crawler cranes can carry out the operation of cutting the steel frame of the vertical wall into the hole. Generally, the site conditions of the construction site are complicated, and the road surface structure is complex. It is very difficult to use wheeled cranes, and at least two wheeled cranes are required. The steel frame of the vertical wall can only be transported to the vicinity of the cave with the cooperation of the crane. The construction is very difficult and the efficiency is low, which makes the construction more difficult and affects the overall construction progress of the vertical wall.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Vertical wall sliding installation supporting device and construction method thereof
  • Vertical wall sliding installation supporting device and construction method thereof
  • Vertical wall sliding installation supporting device and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] Such as figure 1 , 2 , 3, 4, 5, 6, 7, and 8, a vertical wall sliding installation support device includes a translation trolley 3 installed on the translation track 1 through track wheels 2, and the bottoms at both ends of the translation trolley 3 All are provided with inclined retaining grooves 4, and the outer ends of the translation trolley 3 outside the inclined retaining grooves 11 are fixedly equipped with reinforced support seats 5, and the center position of the top surface of each reinforced support seat 5 is provided with a displacement rotation groove 12, and the displacement rotation The groove 12 is a groove-like structure with a semicircular cross section. A number of rollers 10 are movably installed on the inner wall of the displacement rotation groove 12 in the length direction. Raise the anti-skid support layer 6, a rotating support device is movably installed on at least one side of the raised anti-skid support layer 6, and a bottom limit support blo...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a vertical wall sliding installation supporting device and a construction method thereof. Inclined blocking grooves are formed in the bottoms of the two ends of a translation trolley correspondingly, reinforcing supporting seats are fixedly installed at the positions, on the outer sides of the inclined blocking grooves, of the outer end of the translation trolley, a displacement rotating groove is formed in the center of the top face of each reinforcing supporting seat, each displacement rotating groove is of a groove-shaped structure with a semicircular section, a plurality of rolling shafts are movably mounted on the inner wall of each displacement rotating groove in the length direction, a lifting anti-sliding support layer is fixedly mounted at the center of the top of the translation trolley between the two displacement rotating grooves, a rotating support device is movably mounted on at least one side of the lifting anti-sliding support layer, bottom limiting supporting blocks are connected to rail wheels on at least one side of the translation trolley in a clamped mode, and inclined supporting grooves matched with the inclined blocking grooves are formed in the tops of the bottom limiting supporting blocks. A movable platform is used for transferring a vertical wall steel bar frame to a vertical wall hole, transferring without a wheel type crane is achieved, cost is greatly saved, installation construction operation of each vertical wall can be completed through a crawler crane, and a large amount of cost can be saved.

Description

technical field [0001] The invention relates to the field of civil engineering, in particular to a vertical wall sliding installation support device and a construction method thereof. Background technique [0002] The vertical wall is the most common wall in civil engineering. The vertical wall in civil engineering generally refers to the facade wall that needs to be embedded in the tunnel or underground structure. These walls are mostly prefabricated with steel structures and require length and width. And the thickness of the steel frame wall, and then dig out the foundation hole on the ground that matches the length, width and thickness of the vertical wall, and then slowly drop the prefabricated vertical wall into the hole from bottom to top, and finally in the vertical Concrete is poured into the steel frame of the wall and finally made into vertical walls that need to be pre-buried in the ground. These vertical walls provide internal support for later tunnel constructio...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D29/045B66C13/08B66C13/00
CPCE02D29/045B66C13/08B66C13/00
Inventor 赵晋王仪王松威郭平功马政伟武海荣尤培波屈讼昭
Owner HENAN UNIV OF URBAN CONSTR