Underground-ground-midair-air integrated intelligent construction site system and management method

A ground, land, air, space and construction site technology, which is applied in the integrated intelligent construction site system and management field of ground, land, air and space, can solve the problems of weak pre-control risk ability, irregular construction process, and improved construction efficiency, so as to achieve comprehensive intelligent analysis and improve supervision Efficiency, time and cost saving effects

Pending Publication Date: 2021-06-04
北京中安瑞力科技有限公司
View PDF7 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in the construction process, the traditional construction industry also has some problems such as irregular construction process, frequent construction safety problems, construction efficiency needs to be improved, high construction cost, and serious environmental pollution.
[0003] As my country's economic operation has shifted from high-speed growth to high-quality development, the development of the times and science and technology has put forward new construction requirements for the construction industry. The traditional construction site construction management mode has single methods, outdated methods, and weak ability to pre-control risks. and other characteristics restrict the development of new

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Underground-ground-midair-air integrated intelligent construction site system and management method
  • Underground-ground-midair-air integrated intelligent construction site system and management method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0028] Such as Figure 1-Figure 2 As shown, the ground, land, air and space integrated intelligent construction site system in the present invention includes:

[0029] Underground management unit, land surface management unit, air management unit and sky management unit;

[0030] The underground management unit is constructed using a BIM model, the ground management unit is analyzed by intelligent means, the air management unit is patrolled by an unmanned aerial vehicle, and the sky management unit uses Beidou satellite navigation;

[0031] The construction site is monitored through the above-mentioned different management units, so as to realize the labor force management module, mechanical equipment management module, material management module, process method module, green construction module, quality management module, safety management module and progress management module on the construction site. Integrated management of ground, land, air and space;

[0032] The intel...

Embodiment 2

[0062] The present invention also provides an intelligent construction site management method based on the above-mentioned intelligent construction site system. Intelligent management of the construction site is carried out by adopting the integrated intelligent construction site system of ground, land, air and space, including the following steps:

[0063] In the construction of smart construction sites, the technical implementation method integrates technical means such as GIS, 3D oblique photography model, human and vehicle positioning, and AI algorithm identification to realize the all-round integrated collaborative construction of ground, land, air and space. Three-dimensional management of underground, land surface, air, and sky, and comprehensive IoT between personnel, machinery, and materials on the construction site. Through the construction of a construction site intelligent operation system integrating ground, land, air and space, a smart construction site with data ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides an underground-ground-midair-air integrated intelligent construction site system and a management method. The underground-ground-midair-air integrated intelligent construction site system comprises an underground management unit, a ground management unit, a midair management unit and an air management unit. The underground management unit is constructed by adopting a BIM model, the ground management unit adopts an intelligent means for analysis, the midair management unit adopts an unmanned aerial vehicle for routing inspection, and the air management unit adopts a Beidou satellite for navigation; construction of a construction site is monitored through the different management units, so that underground-ground-midair-air integrated management of a labor service personnel management module, a mechanical equipment management module, a material management module, a process construction method module, a green construction module, a quality management module, a safety management module and a progress management module on the construction site is realized. Underground, ground, midair and air all-around integrated cooperative construction and three-dimensional management of a construction site can be achieved, and the construction process is intelligently carried out in a multi-level cooperative and efficient mode.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to an integrated intelligent construction site system and management method of ground, land, air and space. Background technique [0002] As an important industrial branch in the field of infrastructure construction in our country, the construction industry has made important contributions to the economic development of our country. However, in the construction process, the traditional construction industry also has some problems such as irregular construction process, frequent construction safety problems, construction efficiency needs to be improved, high construction cost, and serious environmental pollution. [0003] As my country's economic operation has shifted from high-speed growth to high-quality development, the development of the times and science and technology has put forward new construction requirements for the construction industry. The traditional cons...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q50/08G06F16/29G06T17/05
CPCG06Q50/08G06F16/29G06T17/05
Inventor 黄世祥
Owner 北京中安瑞力科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products