Unlock instant, AI-driven research and patent intelligence for your innovation.

Quick connecting piece for high-rise steel structure building

A fast connection, steel structure technology, applied in building components, buildings, building types, etc., can solve problems such as affecting the production cost of steel structure buildings, steel structure modification, correction and debugging of steel structure buildings, slow construction process and other problems

Inactive Publication Date: 2021-06-08
HUAIBEI FENGLONG STEEL STRUCTURE
View PDF2 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] However, when a modular steel structure building is constructed at high altitude, construction workers are required to have skilled welding skills, and once the construction workers start welding, it will be difficult to modify the steel structure that has been formed, and construction workers need to be in the process of docking the steel structure modules Carry out careful calibration and debugging. Once the above-mentioned calibration and debugging deviate, it will easily cause a delay in the construction process of the steel structure building and affect the production cost of the steel structure building.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Quick connecting piece for high-rise steel structure building
  • Quick connecting piece for high-rise steel structure building
  • Quick connecting piece for high-rise steel structure building

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0038] see Figure 1-5, a quick connector for high-rise steel structure buildings, including a connecting sleeve 1 coated on the outside of a steel structure main body 10, the inner wall of the connecting sleeve 1 is fixedly connected with a mounting part 2, and the mounting part 2 is located in the middle of the inner wall of the connecting sleeve 1 position, the upper and lower ends of the installation part 2 are dug with a plurality of fan-shaped notches 3, and the inner walls of the plurality of fan-shaped notches 3 are fixedly connected with a cutting line 4, and the cutting line 4 is twisted by a plurality of high-tenacity elastic metal wires. The diameter of the cutting line 4 is not greater than 0.3 mm. A storage capsule 5 is placed in the installation part 2. A separation film is fixedly connected to the storage capsule 5. The separation film divides the internal space of the storage capsule 5 into two parts: a water storage chamber 6 and a material storage chamber 7. ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a quick connecting piece for a high-rise steel structure building, and belongs to the field of steel structure connecting pieces. In the scheme, when the connecting piece works, steel structure bodies are pressed to be broken under the action of the gravity of the steel structure bodies; at the moment, liquid water flows into a storage chamber to be mixed with dry concrete to form concrete slurry, along with continuous compression of the steel structure bodies, a storage capsule gradually deforms and is cut by a cutting line connected in a fan-shaped notch to form a crack, the concrete slurry flows out and is gradually solidified to form a concrete block, and the two steel structure bodies are fixed. The high-altitude butt-joint construction technology of the steel structure building produced in a modularized mode can be greatly reduced, deviation is not prone to occurring in the butt-joint process, the overall construction progress of the steel structure building is not prone to being affected, and meanwhile, multiple filling balls are doped to improve the elastic deformation capacity of the formed concrete block.

Description

technical field [0001] The invention relates to the field of steel structure connectors, in particular to a quick connector for high-rise steel structure buildings. Background technique [0002] Steel structure building is a new type of building system. It breaks through the industry boundaries among real estate, construction, and metallurgical industries, and integrates them into a new industrial system. This is the steel structure building system that people in the industry are generally optimistic about. Compared with traditional concrete buildings, steel plates or section steel are used instead of reinforced concrete, which has higher strength and better earthquake resistance. And because the components can be manufactured in a factory and installed on site, the construction period is greatly reduced. Due to the reusable use of steel, construction waste can be greatly reduced, and it is more environmentally friendly, so it is widely adopted by countries all over the wor...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04B1/58E04B1/24E04B1/98E04H9/02
CPCE04B1/58E04B1/2403E04B1/98E04H9/021
Inventor 秦峻岭朱辉王建侠
Owner HUAIBEI FENGLONG STEEL STRUCTURE