Construction method of underground assembly type station precast pile
A construction method and prefabricated pile technology, applied in sheet pile wall, foundation structure engineering, construction, etc., can solve problems such as construction hole wall collapse, and achieve the effects of reducing hole collapse, increasing friction coefficient, and improving shaking.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] The following is attached Figure 1-3 The application is described in further detail.
[0035] refer to figure 1 and figure 2 , the embodiment of the present application discloses a construction method for prefabricated piles of an underground assembly type station, comprising the following steps:
[0036] S1: Prefabricated pile body 1 and guide bracket 3: pre-embed the main pipe 11 in the pile body 1, the end of the main pipe 11 is connected to the top of the pile body 1, and a number of branch pipes 12 are pre-embedded in the pile body 1, and the two ends of each branch pipe 12 Connected to the main pipe 11 and the side wall of the pile body 1 respectively, several branch pipes 12 are arranged in three layers from top to bottom, each layer of branch pipes 12 are distributed circumferentially around the main pipe 11, and the branch pipes 12 are arranged obliquely toward the bottom of the pile body 1;
[0037] S2: Drill construction holes 5 in the construction area;...