A construction method of a new type of joint between a gravity dam and a face dam
A construction method and face dam technology, which is applied in sea area engineering, water conservancy engineering, construction, etc., can solve problems such as relative settlement and tension cracks, complex temperature control measures for concrete, and large amount of concrete engineering, so as to meet the concrete construction period Short, shortened construction period, small amount of concrete works
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0143] The present invention will now be described in detail by taking the application of the present invention to the connection of a gravity dam and a face-face dam in a certain project as an example, which also has a guiding role for the connection of the present invention to other projects.
[0144] The connection joint applied to a gravity dam and a face-face dam of a project described in this embodiment includes the connecting section of the side wall and the barbed wall, a special cushion layer and a composite flexible water stop.
[0145] Wherein, the connecting section of the side wall and the barbed wall in this embodiment is composed of two parts of the side wall along the axis of the dam and the barbed wall in the method of perpendicular to the axis of the dam.
[0146] The connecting section of the hybrid dam is made of concrete, and the side wall along the axis of the dam is a vertical retaining wall with a larger cross-sectional dimension than that of the face-fa...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


