Silicone rubber plugging construction method for installing embedded box
A construction method and pre-embedded box technology, which is applied to electrical components, building components, building insulation materials, etc., can solve problems such as difficult to ensure the quality of wire box walls, affect the quality of concrete molding, increase construction costs, etc., to achieve the elimination of safety Hidden dangers, saving construction time, and improving work efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0023] The invention provides a construction method for installing a pre-embedded box with silicone rubber plugging, which specifically includes the following steps:
[0024] a. Determine the specifications of the pre-embedded box assembly blocks. The pre-embedded box assembly blocks are pre-matched with U-shaped assembly blocks. The opening width of the U-shaped blocks is 3cm;
[0025] b. Before the wall is built, set out the wires to determine the layout position of the wire box, and reserve a counterweight hole at the geometric center of the block, with a diameter range of 4cm;
[0026] d. When the wall is built, the pre-embedded box assembly blocks are simultaneously built in the corresponding position;
[0027] e. The pre-embedded box to be blocked is connected to the occluder through the pipeline, and after the silica gel is transported into the pre-embedded box to be blocked by the occluder, the propeller is started to push the silica gel along the axial direction of th...
Embodiment 2
[0031] The invention provides a construction method for installing a pre-embedded box with silicone rubber plugging, which specifically includes the following steps:
[0032] a. Determine the specifications of the pre-embedded box assembly blocks. The pre-embedded box assembly blocks are pre-matched with U-shaped assembly blocks. The opening width of the U-shaped blocks is 6cm;
[0033] b. Before the wall is built, set out the wires to determine the layout position of the wire box, and reserve a counterweight hole at the geometric center of the block, with a diameter range of 8cm;
[0034] d. When the wall is built, the pre-embedded box assembly blocks are simultaneously built in the corresponding position;
[0035] e. The pre-embedded box to be blocked is connected to the occluder through the pipeline, and after the silica gel is transported into the pre-embedded box to be blocked by the occluder, the propeller is started to push the silica gel along the axial direction of th...
Embodiment 3
[0039] The invention provides a construction method for installing a pre-embedded box with silicone rubber plugging, which specifically includes the following steps:
[0040] a. Determine the specifications of the pre-embedded box assembly blocks. The pre-embedded box assembly blocks are pre-matched with U-shaped assembly blocks, and the opening width of the U-shaped blocks is 5cm;
[0041] b. Before the wall is built, lay out the wires to determine the layout position of the wire box, and reserve a counterweight hole at the geometric center of the block, with a diameter range of 5cm;
[0042] d. When the wall is built, the pre-embedded box assembly blocks are simultaneously built in the corresponding position;
[0043] e. The pre-embedded box to be blocked is connected to the occluder through the pipeline, and after the silica gel is transported into the pre-embedded box to be blocked by the occluder, the propeller is started to push the silica gel along the axial direction o...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Opening width | aaaaa | aaaaa |
| Opening width | aaaaa | aaaaa |
| Opening width | aaaaa | aaaaa |