[0044] The present invention will be further described below in conjunction with the accompanying drawings.
[0045] A lifting process for a large-span grid and truss composite roof, comprising the following steps:
[0046] Step (1), lifting lifting point arrangement. According to the floor plan of the roof and the floor plan of the roof support, and comprehensively considering the coverage of the first lifting, the coverage of the second lifting, the type and power of the commonly used hydraulic lifter, estimate the number of lifting points required , When arranging the hoisting points, use the roof support as much as possible, and make each hydraulic lifter evenly loaded. After comprehensive consideration, a total of 12 sets of lifting points are set up, of which 10 sets of lifting points are set on the roof support, and the other 2 sets of lifting points are set on the temporary lifting point support frame during the first lift, and moved forward to the truss during the se...