Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Building decoration project labor service and project amount real-name management system and method

A management system and engineering quantity technology, which is applied in the field of real-name management system of construction and decoration engineering labor and engineering quantity, can solve the problems of lack of association, single source of information, and inability to realize unified management, and achieve the effect of systematic management

Pending Publication Date: 2021-09-17
浙江绿城筑乐美城市发展有限公司
View PDF11 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The present invention mainly solves the technical problem that the original technical scheme information source is single and lacks correlation, and unified management cannot be realized, and provides a real-name management system and method for building decoration engineering labor and engineering quantity, through the collection module. Data collection, combined with the management module to realize accurate monitoring of the workload of construction and decoration projects, combined with the work information of the laborers in the intranet database, the resumes of the laborers in the external network and the company status of the laborers, to achieve accurate assessment of the laborers, so that Arrange targeted tasks for laborers to achieve systematic management

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building decoration project labor service and project amount real-name management system and method
  • Building decoration project labor service and project amount real-name management system and method
  • Building decoration project labor service and project amount real-name management system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0055] Embodiment: a kind of real-name management system of building decoration engineering labor service and engineering quantity in this embodiment, such as figure 1 As shown, it includes the acquisition module (1), management module (2), communication module (3), cloud (4) and processing module (5) connected in sequence, and also includes the management module (2), communication module (3 ) connected review module (6):

[0056] The acquisition module (1) is used to realize the data acquisition in the whole process of the building decoration project; including the information source mobile phone, the camera device and the data input PC terminal. Through the mobile phone of the information source, the camera device realizes the certification of laborers and the collection of on-site data, and the data is input into the PC terminal for on-site data entry.

[0057] management module (2), such as figure 2 As shown, it is used to analyze and store the collected data. Manageme...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a building decoration project labor service and project amount real-name management system and method. The system comprises an acquisition module, a management module, a communication module, a cloud end, and a processing module, which are connected successively, and an examination module which is connected with the management module and the communication module. The method comprises the steps of data acquisition; labor service personnel qualification judgment and task allocation; project amount monitoring and project information data synchronization; and systematic management of labor service personnel. According to the technical scheme, data of a building decoration construction site is collected through the acquisition module, building decoration project workload accurate to people is monitored in cooperation with the management module, labor service personnel working information in an internal network database, labor service personnel resumes in an external network and labor service personnel company conditions are combined, and accurate evaluation of the labor service personnel is achieved. Therefore, targeted task arrangement is carried out on the labor service personnel, and systematic management is realized.

Description

technical field [0001] The invention relates to the technical field of construction engineering management, in particular to a real-name management system and method for construction and decoration engineering labor services and engineering quantities. Background technique [0002] With the development of the city and the progress of the society, the management of construction projects becomes more and more necessary. Some data show that the construction project management system revolves around the core business of construction enterprises, and realizes the informatization of construction enterprise management through digitization and networking of construction sites. Realize the enterprise's information management of project personnel, materials, mechanical equipment, subcontracting, contracts, construction materials, finance and processes. Existing domestic construction enterprises lack informatization, and there is no management process and rules suitable for the enterp...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q50/08G06Q40/00G06Q10/06G06F16/27G06F16/23G06K17/00
CPCG06Q50/08G06Q40/125G06Q10/06393G06F16/275G06F16/23G06K17/0025
Inventor 王永根吴继锋洪志强冯永红陆雨洁李少辉万宏达章雪苗叶晓君
Owner 浙江绿城筑乐美城市发展有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products