Process-Oriented Joint Scheduling Method of Data Awareness and Dynamic Priority Transmission
A dynamic priority, data-aware technology, applied in the direction of comprehensive factory control, comprehensive factory control, program control, etc., can solve the problems of system delay, loss of key data, etc., and achieve the effect of solving the problem of hysteresis
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0044] Below in conjunction with embodiment, the present invention is described in further detail:
[0045] A process-oriented data perception and dynamic priority transmission joint scheduling method, comprising sensor A, sensor B, fuzzy controller A, fuzzy controller B, embedded processor, wireless transmitter, wireless receiver, server, industrial Equipment A, industrial equipment B, general equipment interface, including the following steps:
[0046] step one,
[0047] The sensor A and the sensor B are respectively connected to the fuzzy controller A and the fuzzy controller B through different general device interfaces, and preset in the fuzzy controller A and the fuzzy controller B. The standard first data and second data are collected in real time through the sensor A and the sensor B, and the collected data are transmitted to the fuzzy controller A and the fuzzy controller B respectively, so as to obtain the first data. a data difference e t , the first data change ...