Bridge engineering construction method
A construction method and technology of bridge engineering, applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of protracted construction period, long bridge construction period, and restriction of the total construction period, so as to ensure safe construction and improve construction efficiency Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0018] Embodiment: a kind of bridge engineering construction method, comprises the following steps:
[0019] S1: Use theodolite to measure the longitudinal and transverse centerlines of pier and abutment foundations, and excavate according to the excavation depth, soil quality and water seepage. slope;
[0020] S2: Set support frames along both sides of the road, the distance between two adjacent support frames is 5-8m, set a protective plate between the two support frames, the two sides of the protective plate are in contact with the support The frame is fixed, and the warning tape is on the outer side of the protective plate;
[0021] S3: Defensive line measurement, according to the design drawings, use theodolite to accurately locate the pile position, and use the rotary drilling rig to drill. The rotary drilling machine is 10-20cm larger than the pile diameter. During the drilling process, the drilling rig must be kept stable without displacement and subsidence. Afterwar...