Supporting assembly and method for pile repairing

A technology for supporting components and filling piles, which is applied in excavation, construction, infrastructure engineering, etc., can solve problems such as lack of supporting components and methods, achieve significant economic and social benefits, speed up construction progress, and ensure construction quality.

Pending Publication Date: 2021-12-28
CHINA MCC5 GROUP CORP
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In summary, the prior art still lacks a support assembly and method for pile repair operations.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Supporting assembly and method for pile repairing

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0046] A support assembly for pile filling, including a main beam, a secondary beam, a slab and an A-shaped brace. There are multiple main beams and secondary beams, and the multiple main beams are arranged in parallel on the first concrete support beam, and the secondary beams It is arranged between two adjacent main beams, the slab is laid on the top of the main beams, and the two ends of the A-shaped brace are respectively connected to the first concrete support beam and the second concrete support beam.

[0047] In this embodiment, a column is also included, and the two ends of the column are respectively connected to the first concrete support beam and the second concrete support beam.

[0048] In this embodiment, HM582x300x11x15, I-beam with strength grade of Q355 is used as the main beam,

[0049] In this embodiment, channel steel with 16a strength grade of Q235 is used as the secondary beam,

[0050] In this embodiment, 250*250*10 square steel with a strength grade of...

Embodiment 2

[0053] Such as figure 1 Shown, show a kind of method for supplementing piles, comprising the following steps:

[0054] S1, measurement and setting out;

[0055] S2, buried casing;

[0056] S3, placing the main beam, and setting the main beam on the first concrete support beam in parallel;

[0057] S4. Place the secondary beam and the slab, arrange the secondary beam between two adjacent main beams, and lay the slab above the main beam;

[0058] S5, install the A-shaped brace, connect the two ends of the A-shaped brace to the first concrete support beam and the second concrete support beam respectively;

[0059] S6. Carry out pile filling operation on the flat plate.

[0060] In this embodiment, step S3 includes: placing a main beam every 1-1.2m, and popping up the main beam placement position on the top of the crown beam with a gray line or ink line, placing a 10mm steel plate in the center of the main beam and installing the steel plate through expansion bolts. Fixed on th...

Embodiment 3

[0064] In a specific embodiment, a pile filling method comprises the following steps:

[0065] Step 1, measuring and setting out

[0066] Use GPS or total station to locate the pile position in the trestle bridge and foundation pit. The error of any direction of the pile position is not more than 20mm. After confirmation, mark the pile position with obvious markers.

[0067] Step 2. Embedding the casing

[0068] When hoisting the steel casing, use the 80T truck crane to lift the steel casing through the single-point hoisting method of the wire rope to feed the piles. When inserting the piles, the pile heads must be aligned with the pile position markers on the ground, and two theodolites are crossed at 90° Observe the verticality at the place where the full length of the pile can be clearly seen, and ensure that the verticality of the first section shall not exceed 0.5%, and the verticality of the remaining sections shall not exceed 1%. The verticality of the pile in the fir...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a supporting assembly and method for pile repairing. The supporting assembly comprises a plurality of main beams, a plurality of secondary beams, flat plates and A-shaped supports, the multiple main beams are arranged on a first concrete supporting beam in parallel, the secondary beams are arranged between every two adjacent main beams, the flat plates are laid above the main beams, and the two ends of the A-shaped supports are correspondingly connected with the first concrete supporting beam and a second concrete supporting beam. The method comprises the following steps that S1, surveying and setting out are carried out; S2, a pile casing is buried; S3, the main beams are placed, and the main beams are arranged on the first concrete supporting beam in parallel; S4, the secondary beams and the flat plates are placed, the secondary beams are arranged between the two adjacent main beams, and the flat plates are laid on the main beams; S5, the A-shaped supports are installed, and the two ends of the A-shaped supports are correspondingly connected with the first concrete supporting beam and the second concrete supporting beam; and S6, pile repairing operation is carried out on the flat plates.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a supporting component and method for pile repair. Background technique [0002] After the completion of the engineering piles and the enclosure structure, the basement floor has not started to work, and the piles need to be repaired due to external or internal reasons. At this time, the pile foundation operation does not have a flat floor, the pile foundation does not have the operation conditions, and the excavation site is 3 meters below the soil surface. For underground confined water, pile foundation operations cannot be carried out after excavation to the bottom of the foundation pit or the floor is completed, and the height between the two supports shall not exceed 10 meters. [0003] To sum up, the prior art still lacks a supporting component and method for pile repairing operations. Contents of the invention [0004] The invention provides a supporting c...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D17/04
CPCE02D17/04
Inventor 周瑞
Owner CHINA MCC5 GROUP CORP