Concrete crack repairing construction process for building construction
A crack repairing and building construction technology, applied in building maintenance, construction, building construction, etc., can solve the problems of insufficient repairing glue pouring depth, low pouring pressure, and difficult to guarantee repairing effect.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] A construction technique for repairing concrete cracks for building construction, comprising the following steps:
[0041] S1: Put A and B repair glues in the first solution tank 12 and the second solution tank 13;
[0042] S2: Control the outflow of the repair glue through the first control valve 14 and the second control valve 15, the scale 121 can check the outflow amount, and then make the A and B two kinds of repair glue flow into the mixing pool through the ratio of 3:1 within 16;
[0043] S3: Start the motor 21 to rotate the steering gear 1 22, and the rotation of the steering gear 22 will drive the stirring rod 23 to rotate, and the stirring blades on the stirring rod 23 will stir and mix the A and B repair glues in the stirring tank 16 ;
[0044] S4: Open the high-pressure gas cylinder 42 to pressurize the inside of the stirring tank 16 through the exhaust pipe 43;
[0045] S5: When repairing the crack, the pressure inside the mixing tank 16 will cause the m...
Embodiment 2
[0054] An auxiliary function is added on the basis of the first embodiment.
[0055] One side of the connection base 41 is fixedly connected with a shunt assembly 6, the shunt assembly 6 includes a fixed plate 61, a fixed frame 62 and a shunt plate 63, the bottom of the fixed plate 61 is fixedly connected with a fixed frame 62, and the inside of the fixed frame 62 is fixedly connected with a shunt plate 63.
[0056] refer to Figure 2-4 , one side of the connection base 41 is fixedly connected to the fixed plate 61, and the bottom of the fixed plate 61 is equipped with a fixed frame 62, and the inner side of the fixed frame 62 is installed with a splitter plate 63, so when encountering a larger clod , diverter plate 63 can make soil clod carry out diversion, make it shunt to the both sides of device, prevent the phenomenon that soil clod is too big and brush 56 can't be cleaned.