BIM-based municipal engineering intelligent construction site management system

A management system and engineering technology, applied in the field of engineering project management system, can solve the problems of disjointed construction progress, inadequate control of prefabricated component production progress, low timeliness of information, etc., and achieve control, management and construction progress Effect

Pending Publication Date: 2022-01-28
SHANGHAI PUDONG NEW AREA CONSTR GRP CO LTD
View PDF0 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The traditional engineering management mode has many disadvantages in the current environment, such as the inability to understand the information of the construction workers on the site in a short time, the supervision is not timely, the implementation is not in place, the timeliness of information is low, and the site dynamics cannot be grasped in real time, and There are problems such as insufficient control of the production progress of prefabricated components and disconnection with the actual construction progress on site, which may cause delays in construction progress and affect safety production management

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM-based municipal engineering intelligent construction site management system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0040] figure 1 It is a schematic diagram of the framework of the municipal engineering smart construction site management system of BIM of the present invention.

[0041] See figure 1 , the BIM municipal engineering smart construction site management system provided by the present invention includes:

[0042] Management platform 01, BIM module 02, environmental supervision module 03, personnel management module 04, equipment management module 05, site monitoring module 06; management platform 01 and BIM module 02, environmental supervision module 03, personnel management module 04, equipment management module 05 , The site monitoring module 06 is connected through a 4G / 5G network.

[0043] The BIM module 02 establishes the 3D BIM model (Building Information Model) 021 of the project through Revit software, and uploads it to the management platform 0...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a BIM-based municipal engineering intelligent construction site management system. The system comprises a management platform, a personnel management module, an equipment management module, an environment management module, a site monitoring module and a BIM module, wherein the personnel management module collects information of construction workers in a site and information of visitors outside the site and uploads the information to the management platform; the equipment management module collects information and operation states of large-scale construction operation equipment in the site and uploading the information and the operation states to the management platform; the environment monitoring module monitors environment data in and around the construction operation site and uploads the data to the management platform, and the platform sends an alarm instruction according to an alarm value; the site monitoring module returns pictures in the construction operation site to the management platform in real time; and the BIM module converts the whole project into a three-dimensional BIM model, so that details and construction progress of the project are visually observed. According to the invention, informatization management of a construction site is realized, the management efficiency is improved, and promotion of the project progress and quality control are facilitated.

Description

technical field [0001] The invention relates to an engineering project management system, in particular to a BIM-based smart construction site management system for municipal engineering. Background technique [0002] With the improvement of green construction requirements and the continuous development of prefabricated buildings, as well as the normalized protection of the current epidemic. The traditional engineering management mode has many disadvantages in the current environment, such as the inability to understand the information of the construction workers on the site in a short time, the supervision is not timely, the implementation is not in place, the timeliness of information is low, and the site dynamics cannot be grasped in real time, and There are problems such as insufficient control of the production progress of prefabricated components and disconnection with the actual construction progress on site, which may cause delays in construction progress and affect ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06F30/13G06T17/00G06T5/50G06Q50/08G08B21/18H04N7/18
CPCG06Q10/0631G06F30/13G06T17/00G06T5/50G06Q50/08H04N7/18G08B21/182G06T2207/10016G06T2207/10032G06T2207/20221
Inventor 解洪许张狄沈松烨顾彬胡志超
Owner SHANGHAI PUDONG NEW AREA CONSTR GRP CO LTD
Features
  • Generate Ideas
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More