Manufacturing device and manufacturing method for large-diameter super-long pile double-layer reinforcement cage
The technology of a double-layer reinforcement cage and its production method is applied in the fields of online netting, other household appliances, household appliances, etc., which can solve the problems of difficulty in ensuring the integrity of the reinforcement cage, affecting the splicing construction of the reinforcement cage, and high difficulty in production, so as to save production costs and The effect of investment in processing sites, improvement of overall quality and efficiency, and rapid construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment 1
[0058] See figure 1 ,Should figure 1 It is a structural schematic diagram of a double-layer high reinforcement cage for a large-diameter super-long pile described in this embodiment.
[0059] The double-layer high reinforcement cage for large-diameter super-long piles produced by the present invention is formed by splicing several reinforcement cage segments, and each reinforcement cage segment includes a stiffening hoop 11 and a main reinforcement 12 arranged along the circumference of the stiffening hoop 11 . The reinforcement cage is a variable-section reinforcement cage, and the reinforcement cage segment includes two types: the upper double-layer reinforcement cage segment 110 and the lower single-layer reinforcement cage segment 120, and the main reinforcement of the single-layer reinforcement cage 120 at the variable section of the variable-section reinforcement cage 12 is connected with the inner main reinforcement 1101 of the double-layer reinforcement cage 110. The...
specific Embodiment 2
[0063] See figure 2 ,Should figure 2 It is a structural schematic diagram of a manufacturing device for a double-layer reinforcement cage for a large-diameter super-long pile described in this embodiment.
[0064] The device for making double-layer reinforcement cages for large-diameter and super-long piles includes a general-purpose tire frame 2. The top surface of the general-purpose tire frame 2 is provided with an arc-shaped installation part 21 for installing the main reinforcement, and also includes a positioning rod 22 and a heightening ring plate 3 for positioning. The rod 22 is arranged on the side of the universal tire frame 2, and the positioning rod 23 is arranged along the radial direction of the arc-shaped mounting part 21, and is used for locating the main bars forming the reinforcement cage. The heightening ring plate 3 is detachably installed on the arc-shaped installation part 21, and is used for erecting the main reinforcement 1201 of the single-layer rei...
specific Embodiment 3
[0067] The manufacture method of the double-layer reinforcement cage of the large-diameter super-long pile provided by the present invention comprises the following steps:
[0068] 1) Make the stiffening hoop according to the design size;
[0069] 2) Positioning and arranging the outer layer main reinforcements for forming part of the reinforcement cage segment on the common tire frame;
[0070] Such as figure 2 As shown, under the constraints of the positioning rod 22 on the general tire frame 2, the outer layer main reinforcement 1102 for forming the steel cage segment is arranged on the general tire frame 2,
[0071] 3) Arrange the stiffening hoop on the inner side of the positioned outer layer main reinforcement, and weld and fix it with the positioned outer layer main reinforcement;
[0072] Such as image 3 As shown, the position of the stiffening hoop 11 is positioned on the positioned outer main reinforcement 1102 , and the stiffening hoop 11 is arranged outside th...