Unlock instant, AI-driven research and patent intelligence for your innovation.

Prefabricated plate bolt connection system of fabricated composite beam bridge and construction method of prefabricated plate bolt connection system

A connection system and plate bolt technology, which is applied to the prefabricated plate bolt connection system of prefabricated composite girder bridges and its construction field, can solve the problems of large bridge deck operation area, affecting bridge durability, bridge deck damage, etc., and achieve fast demolition speed , save construction cost, control quality effect

Pending Publication Date: 2022-03-01
HUA HUI ENGINEERING DESIGN GROUP CO LTD +1
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the bridge deck of the bridge mainly adopts the cast-in-place construction method. Due to the large operating area of ​​the bridge deck, a large number of dry shrinkage cracks and temperature cracks are prone to appear during the concrete pouring of the bridge deck, which seriously affects the durability of the bridge, and the partial damage of the bridge deck in the later stage is difficult to replace.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prefabricated plate bolt connection system of fabricated composite beam bridge and construction method of prefabricated plate bolt connection system
  • Prefabricated plate bolt connection system of fabricated composite beam bridge and construction method of prefabricated plate bolt connection system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0029] As shown in the figure, an assembled girder bridge prefabricated slab connection system includes several prefabricated bridge decks 1 with holes, and steel girders 2 arranged between adjacent prefabricated bridge decks 1 with holes. An epoxy resin layer 5 is provided, and the horizontal reserved holes opened on the boundary of the perforated prefabricated bridge deck 1 are connected by bolt fasteners 3, and the vertical reserved holes opened on the boundary of the perforated prefabricated bridge deck 1 are connected to the steel girder 2 The upper wing plate 21 is connected by a bolt shear key 4 .

[0030] This application realizes the connection of adjacent prefabricated slabs with bolt fasteners 3 and prefabricated bridge decks 1 with holes, and applies epoxy resin layer 5 between the gaps of prefabricated bridge decks 1 with holes. Co...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the field of bridge engineering, in particular to an assembly type composite beam bridge prefabricated slab bolt connection system and a construction method thereof.The assembly type composite beam bridge prefabricated slab bolt connection system comprises a plurality of prefabricated bridge deck slabs with holes and bolt fasteners arranged between the adjacent slabs, and steel beams are connected with the prefabricated bridge deck slabs with the holes through bolt shear keys; the prefabricated bridge deck slabs with the holes are connected through the bolt fasteners, the two ends of each bolt fastener are located in the corresponding horizontal preformed hole, the epoxy resin layers are laid in gaps between the slabs, and water leakage is prevented. The device is applied to beam bridge construction and has the advantages of simple structure, convenience in assembly, high implementation speed and the like.

Description

technical field [0001] The invention relates to the field of bridge engineering, in particular to an assembled composite girder bridge prefabricated slab bolt connection system and a construction method thereof. Background technique [0002] With the further advancement of bridge industrialization, the construction method has gradually changed from the traditional on-site pouring of all components to factory prefabrication of some or most of the components, and then transported to the site for installation; compared with traditional construction methods, the industrial prefabrication method first requires What is solved is the connection between the various prefabricated components. At present, the bridge deck of the bridge mainly adopts the cast-in-place construction method. Due to the large operating area of ​​the bridge deck, a large number of dry shrinkage cracks and temperature cracks are prone to appear during the concrete pouring of the bridge deck, which seriously af...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D19/12E01D21/00E01D101/30E01D101/26E01D101/40
CPCE01D19/125E01D21/00E01D2101/30E01D2101/26E01D2101/40
Inventor 王立超陈建伟王蓉蓉钱一栋何余良