Supercharge Your Innovation With Domain-Expert AI Agents!

Construction site arrangement optimization method and system based on BIM + GIS

A construction site and optimization method technology, which is applied in the field of construction engineering informatization, can solve the problem that the static construction site layout method cannot meet the dynamic optimization requirements, and achieve the effect of improving rationality and controllability

Pending Publication Date: 2022-03-11
中海建筑有限公司 +1
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Aiming at the defects and improvement needs of the prior art, the present invention provides a construction site layout optimization method and system based on BIM+GIS. The problem of adapting to dynamic optimization needs

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction site arrangement optimization method and system based on BIM + GIS
  • Construction site arrangement optimization method and system based on BIM + GIS

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not constitute a conflict with each other.

[0029] In the present invention, the terms "first", "second" and the like (if any) in the present invention and drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence.

[0030] figure 1 The flow chart of the BIM+GIS-based construction site layout optimization method provided by the embodiment of the present invention. refer to f...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction site arrangement optimization method and system based on BIM + GIS, and belongs to the field of constructional engineering informatization. The method comprises the steps that firstly, a BIM model family library of various facilities needed by a construction site and GIS models of the construction site and the surrounding environment are constructed, and then the BIM model family library and the GIS models are fused; and establishing a construction site arrangement optimization multi-objective function by utilizing an SLP method based on the fused model, and solving an optimal solution of the construction site arrangement optimization multi-objective function by taking the minimum weighted value of the sum of the occupied areas of the various facilities and the sum of the logistics costs of the various facilities as a target and combining constraint conditions. According to the method, the rationality and controllability of arrangement of various temporary facilities on the construction site are analyzed and optimized, the construction transportation cost and the temporary land area are reduced, various adjustments are carried out on the arrangement of the construction site, a feasible optimized arrangement scheme is provided, and reference can be provided for optimization of similar engineering site arrangement.

Description

technical field [0001] The invention belongs to the field of construction engineering informatization, and more specifically relates to a BIM+GIS-based construction site layout optimization method and system. Background technique [0002] The layout of the construction site is an important part of the project construction preparation work, which needs to be considered in combination with green space restrictions, cultivated land restrictions, planning red lines, safety requirements, various temporary land use indicators, logistics intensity and logistics costs between temporary buildings, etc. Factors can effectively carry out construction site layout, and create conditions and foundations for subsequent construction management, cost control, and safety management. [0003] The site layout design in the actual implementation of the project at this stage is mostly determined by the site technical director based on the CAD drawings combined with his own experience and the actu...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F30/13G06F30/20G06Q10/04
CPCG06F30/13G06F30/20G06Q10/043G06F2111/06G06F2111/04
Inventor 朱海明王顺超王嘉晨万桂军何永顺陈维亚胡齐胜刘春舵
Owner 中海建筑有限公司
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More