Treatment method for small watershed of Yellow River
A technology for small watersheds and watersheds, applied in the field of management of small watersheds of the Yellow River, can solve the problems of watershed conditions that have not been fundamentally changed, damage to water and soil conservation facilities, water and soil loss, etc., to achieve the effect of reducing water and soil loss, reducing impact, and not easy to break
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] A control method for the small watershed of the Yellow River, comprising the steps of:
[0034] (1) multiple holes are made on the hillside of the watershed, the depth of the hole is 27cm, and the diameter is 6cm, and the fallen leaves that are crushed are put into the bottom of the hole, and the depth of the fallen leaves is 18cm, and the elm trees are densely planted with elm seeds, and the elm wall is pruned into, used for keep water and soil;
[0035] (2) Make a plurality of holes at the bottom of the Shuichong ditch, the depth of the holes is 20cm, the distance between the holes is 22cm, and the elm branches are cut for water blocking;
[0036] (3) build dikes and dams at water gullies that need to be controlled, and deposit sand and soil. Described dikes and dams are barrel-shaped for elm branches to be woven into, and soil is filled in the buckets, and multiple buckets are connected with iron wires to form.
Embodiment 2
[0038] A control method for the small watershed of the Yellow River, comprising the steps of:
[0039] (1) multiple holes are made on the hillside of the watershed, the depth of the hole is 30cm, and the diameter is 5cm, and the fallen leaves that are crushed are put into the bottom of the hole, and the depth of the fallen leaves is 20cm, and the elm trees are densely planted with elm seeds, and the elm wall is pruned into, used for keep water and soil;
[0040] (2) Make multiple holes at the bottom of the Shuichong ditch, the depth of the holes is 25cm, the distance between the holes is 20cm, and the elm branches are cut for water blocking;
[0041] (3) build dikes and dams at water gullies that need to be controlled, and deposit sand and soil. Described dikes and dams are barrel-shaped for elm branches to be woven into, and soil is filled in the buckets, and multiple buckets are connected with iron wires to form.
Embodiment 3
[0043] A control method for the small watershed of the Yellow River, comprising the steps of:
[0044] (1) multiple holes are made on the hillside of the watershed, the depth of the hole is 33cm, and the diameter is 4cm, and the fallen leaves that are crushed are put into the bottom of the hole, and the depth of the fallen leaves is 22cm, and the elm trees are densely planted with elm seeds, and the elm wall is pruned into, used for keep water and soil;
[0045] (2) Make multiple holes at the bottom of the Shuichong ditch, the depth of the holes is 30cm, the distance between the holes is 18cm, and the elm branches are cut for water blocking;
[0046] (3) build dikes and dams at water gullies that need to be controlled, and deposit sand and soil. Described dikes and dams are barrel-shaped for elm branches to be woven into, and soil is filled in the buckets, and multiple buckets are connected with iron wires to form.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
