High-concentration ore discharge tailing pond upstream method damming construction method
A construction method, mine tailings technology, applied in the direction of instruments, electrical digital data processing, computer-aided design, etc., can solve the problems of reduced effective dam construction, reduced sand settling rate, and reduced average particle size of sand settling particles
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0067] Step 1. Collect relevant calculation parameters for grading and damming of tailings ponds and calculate key parameters
[0068] (1) According to the design scheme of the tailings pond, the engineering volume V is obtained dam , the height of the dam body H, the control area of the tailings reservoir to be dammed A, and the storage capacity utilization coefficient Design values of other parameters.
[0069] (2) Obtain the value of the tailings output M of the dressing plant through on-site investigation.
[0070] (3) The true specific gravity of tailings G can be obtained through indoor testing s and tailings dam grit dry density ρ d value.
[0071] (4) On-site sampling test to obtain the natural density ρ of beach tailings b and the value of -200 mesh particle content P in the raw ore, the concentration C of the original tailings and the concentration C of the flushing slurry f .
[0072] (5) According to the engineering experience, the -200 mesh particle co...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


