Novel gabion retaining wall capable of dissipating energy and greening and construction method
A gabion retaining wall and energy dissipation technology, applied in botanical equipment and methods, artificial islands, water conservancy projects, etc., to achieve the effects of enhancing tensile strength, improving extrusion capacity, and improving overall stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] see Figure 1-4 , a new gabion retaining wall capable of dissipating energy for greening and its construction method, which includes energy dissipating greening gabion net 1, plain concrete 2, prefabricated concrete slab 3, ribbed steel bar 4, vegetation nutrient soil 5, energy dissipating material 6, Steel strand 7, decompression ring 8, three-dimensional vegetation mat 9, geotextile 10, stone 11, horizontal reserved hole 12, vertical reserved hole 13, cross buckle 14 and other materials. Wherein the vegetation nutrient soil 5 is loaded on the side of the energy dissipation greening gabion net 1 away from the side slope, which can play the effect of vegetation growth and greening the side slope, and the energy dissipation material 6 is filled on the side of the energy dissipation greening gabion net 1 near the side slope On the side, the steel strand 7 and the decompression ring 8 are used to form a flexible connection with the energy-dissipating greening gabion 1, and...
Embodiment 2
[0045] The construction method of the new gabion retaining wall for greening with energy dissipation includes the following steps:
[0046] S1, Excavation of retaining wall foundation pit and positioning and setting out: According to the design documents, the relevant data, materials and geometric dimensions in the construction drawing shall be verified; the construction unit shall designate a special person to be responsible for the measurement work, and provide the required measurement in time Data; confirm the position of the cage according to the coordinates of the positioning point in the plan, and pull the wire at the control point to confirm the plane position of the cage; during construction, the borrowed or set construction control signs and elevation points must be strictly protected, and regularly inspected and corrected;
[0047] S2, inserting bars and pouring: according to the design documents, carry out positioning drilling, first lay the first layer of plain conc...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com