Construction method of parameter presetting for in-situ replacement of signal switch
A construction method and technology for turnouts, which are applied to railway signals, hydraulic equipment for operating turnouts or line interrupters, and electrical equipment for operating turnouts or line interrupters, etc., can solve the problem of high construction cost and long construction time. problems, to achieve the effect of shortening the construction time and reducing the construction cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] In order to more clearly understand the above objects, features and advantages of the present disclosure, the solutions of the present disclosure will be further described below. It should be noted that, in the case of no conflict, the embodiments of the present disclosure and the features in the embodiments can be combined with each other.
[0027] In the following description, many specific details are set forth in order to fully understand the present disclosure, but the present disclosure can also be implemented in other ways than described here; obviously, the embodiments in the description are only some of the embodiments of the present disclosure, and Not all examples.
[0028] Since the switch machine and the installation device of the new turnout are all parts in a box, the switch machine main engine is installed first, and the locking device is assembled and connected to the rail, and then fastened, and then the transmission rod (action rod, connecting rod, l...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
