Fabricated precast concrete floor slab and production method
A technology of prefabricated concrete and production methods, applied to floors, manufacturing tools, auxiliary forming equipment, etc., can solve problems affecting the strength of floors in the later stage, rust on the surface of truss steel bars, etc., to reduce rust, reduce rust, and facilitate production Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] The embodiment of this application discloses a prefabricated concrete floor slab, refer to figure 1 and figure 2, including a plurality of interconnected prefabricated bottom slabs 1, the prefabricated bottom slab 1 is provided with a steel mesh 2, and the steel mesh 2 is connected with truss bars 3, after the prefabricated bottom slabs 1 are connected to each other at the construction site, the part of the truss steel bars 3 is formed by the prefabricated bottom slab 1 The upper surface of the truss bar 3 protrudes, and is used to erect the upper steel bar 4 above the truss bar 3, so that the truss bar 3 can play a supporting role in the process of erecting the upper bar bar 4, which facilitates the setting of the upper bar bar 4. The cast-in-place layer 5 is formed by pouring concrete on the upper surface of the prefabricated bottom slab 1, the upper steel bar sheet 4 is located in the cast-in-place layer 5, and the truss steel bars 3 protruding from the upper surfac...
Embodiment 2
[0050] This embodiment discloses a production method of an assembled prefabricated concrete floor slab, referring to Figure 8 , the difference from Embodiment 1 is that: before the prefabricated floor 1 is poured, a reusable air support assembly 9 is installed in the installation sleeve 6, the air support assembly 9 includes an outer support body 91 and an air bag 92, and the outer support body 91 is a multi-lobed structure, the airbag 92 is cylindrical, and the outer support body 91 of multi-lobe structure is wrapped on the airbag 92 to support the shape of the airbag 92, and the airbag 92 can block the inside of the outer support body 91 to reduce the mortar entering Inside the outer support body 91 . After the outer support body 91 is connected to the installation sleeve 6, the air bag 92 is filled with gas, and then the prefabricated bottom plate 1 is poured, and then when the strength of the prefabricated bottom plate 1 reaches 30%, the gas in the air bag 92 is released,...