Building construction project progress management method and system, electronic equipment and storage medium

A technology for project progress and building construction, applied in information technology support systems, data processing applications, instruments, etc., can solve problems such as inappropriate distribution of data to construction personnel, failure of data to be returned in time, and impact on construction period, etc., to achieve real-time and effective supervision The role of improving management efficiency and the effect of saving economic costs

Pending Publication Date: 2022-05-27
SICHUAN JIAOTOU CONSTR ENG CO LTD +1
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In this process, due to the complexity and complexity of the engineering units of the project, and based on the high responsibility for the quality and safety of the project, it is necessary to carry out quality inspection for the division of engineering units into sub-projects or even inspection batches, and for completion acceptance of engineering units into unit projects. and final accounts, the acceptance data generated during the acceptance period are complicated, resulting in great difficulties in data information exchange and project progress acquisition.
Moreover, the supervisor and the owner can only check these materials and information during the construction period of the existing planning project, and make corrections for possible errors, and these revisions often require long-term measurement, approval and reporting to form. The final data cannot be returned to the construction personnel of the existing planning project in time, which often affects the construction period
In addition, the revised data may be inappropriately assigned to the wrong construction personnel, making it difficult for existing planning projects to be corrected correctly, further affecting the project progress

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building construction project progress management method and system, electronic equipment and storage medium
  • Building construction project progress management method and system, electronic equipment and storage medium
  • Building construction project progress management method and system, electronic equipment and storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0063] In order to make the objectives, technical solutions and advantages of the present application more clear, the present application will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application, but not to limit the present application.

[0064] It should be noted that like numerals and letters refer to like items in the following figures, so once an item is defined in one figure, it does not require further definition and explanation in subsequent figures.

[0065] Furthermore, in the description of the present invention, although the subject matter will be described in conjunction with these embodiments, it will be understood that they are not intended to limit the subject matter to these embodiments. On the contrary, the subject matter described herein is intended to cover alternatives, modifications and equiv...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a building construction project progress management method. The method comprises the following steps: acquiring preset quantitative information of engineering design content; obtaining an acceptance confirmation request generated by the first user through the triggering operation; determining a second user according to the acceptance confirmation request; actual quantitative information of the engineering construction content is obtained; sending the actual quantitative information to a second user; obtaining an acceptance confirmation result generated by the second user through the triggering operation, and judging whether the engineering construction content passes acceptance according to the acceptance confirmation result; and according to the judged acceptance confirmation result, the actual quantitative information and the acceptance confirmation result are sent to the third user, or the acceptance confirmation result is sent to the first user, so that management of the progress of the building construction project is realized. According to the invention, an informatization process and means are adopted, original paper data are converted into terminal operation, the error-tolerant rate is reduced, the economic cost is saved, the management benefit angle is improved, and the real-time and effective supervision effect on the progress of a building construction project can be realized.

Description

technical field [0001] The invention relates to the technical field of construction project management, in particular to a construction project schedule management method, system, electronic equipment and storage medium. Background technique [0002] In the current construction practice, the construction project progress is mainly handled by the constructor, the supervisor and the owner. The owner obtains drawings, plans and budgets and other design and construction materials from the design unit and hand them over to the constructor. Construction, after the completion of the construction, the construction results will be summarized to the supervisor, the supervisor will confirm the acceptance after receiving the construction results, and the owner will pay the construction party after obtaining the acceptance confirmation, and will be informed of the project progress accordingly. [0003] In this process, due to the complexity of the engineering units of the project, and ba...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08
CPCG06Q10/06311G06Q10/06313G06Q10/0633G06Q10/103G06Q50/08Y04S10/50
Inventor 罗红李维何佩李明唐浪辉张雪松李惠翔郭亚文
Owner SICHUAN JIAOTOU CONSTR ENG CO LTD
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More