A bearing and gasket technology, applied in the field of preparation of gas turbine bearing pad force measuring gaskets, can solve the problems of non-replaceable use, high strain gauge damage rate, inability to accurately measure axial force, etc., to save maintenance, improve Accuracy and toughness-enhancing effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 1
[0042] Embodiment 1: Combining Figure 1 to Figure 4 Describe this embodiment, which includes the following steps:
[0043] Step 1: Process the bearing gasket 1:
[0044] Step 11: Arrange the bearing pad gasket 1 longitudinally, and on the plane of the bearing pad gasket 1, take the center point of the bearing pad gasket 1 as the benchmark, and open a strain gauge slot 2 for placing the strain gauge 5;
[0045] Step 1 and 2: a wire groove 3 with a length from one side of the strain gauge groove 2 to the other side edge of the bearing pad gasket 1 is opened under the strain gauge groove 2, and the bottom of the strain gauge groove 2 is adjacent to the wire groove 3;
[0046] Step 13: A chamfer 4 is provided at the connection between the strain gauge groove 2 and the wire groove 3;
[0047] Step 2: Eliminate the metal stress of the bearing pad gasket 1 in Step 1:
[0048] Step 3: Process the strain gauge groove 2 and the wire groove 3:
[0049] Step 31: Grind the strain gaug...
specific Embodiment approach 2
[0062] Specific implementation mode 2: Combining figure 1 Describing this embodiment, in the second step of this embodiment, the metal stress of the bearing pad gasket 1 in step 1 is eliminated as follows: the processed bearing pad gasket 1 is placed on the dynamometer, and the process is carried out 3 times according to the maximum working pressure Loading, the holding time of each rated load should be 1min. After each loading to the rated load, unload to zero load and wait for at least 30s to eliminate the metal stress. Other components and connection relationships are the same as in the first embodiment.
specific Embodiment approach 3
[0063] Specific implementation three: combination figure 1 Illustrating this embodiment, in step 2 of this embodiment, the speed of three times of loading according to the maximum working pressure is 8-20 kN / s. This arrangement facilitates better elimination of metal stress. Other compositions and connection relationships are the same as in the first or second embodiment.