System for rearranging purchase orders and its method

A purchase order and single-weight technology, applied in special data processing applications, instruments, electrical digital data processing, etc., can solve problems such as increased inventory pressure, increased inventory, and increased inventory, and achieve reduced production costs and reasonable and effective material quantities Effect

Inactive Publication Date: 2004-03-10
HONG FU JIN PRECISION IND (SHENZHEN) CO LTD +1
View PDF0 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the existing SAPStandard MRP system cannot effectively deal with the rearrangement of purchase orders caused by changes in material requirements
For example, SAP Standard MRP cannot split the original purchase order, but treat it as a whole purchase order, which leads to the following problems: (1) If the existing material demand is less than the expected demand, Purchasing according to the original purchase order will inevitably lead to the supply quantity of the material being greater than the demand quantity of the material, resulting in an increase in inventory and increasing inventory pressure. Therefore, a part of the purchase quantity of the original purchase order should be reduced to make the material supply equal to the material demand, but SAP Standard MRP does not handle similar situations, resulting in unnecessary inventory
(2) If the material demand changes, SAP Standard MRP will use the original purchase order as a whole unit to reschedule (reschedule), which causes a large increase in inventory and makes the company take unnecessary risks. For a purchase order with a date of 2002 / 08 / 01 and a quantity of 10,000 units, the material demand is changed to 2002 / 07 / 01 as 1,000 units and 2002 / 12 / 01 as 9,000 units. Quantity 10,000 units was rescheduled to 2002 / 07 / 01, which resulted in an excess inventory of 9,000 units during the period from 2002 / 07 / 02 to 2002 / 12 / 01

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • System for rearranging purchase orders and its method
  • System for rearranging purchase orders and its method
  • System for rearranging purchase orders and its method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0012] First, the relevant terms involved in the present invention are described as follows.

[0013] Time period: In the related reports of MRP, data such as demand quantity and supply quantity of a certain time period are often combined in one column and presented, and this time period is called time period.

[0014] Delivery date: refers to the delivery date of the purchase order, that is, the date when the material supplier delivers the goods to the enterprise's factory area.

[0015] Processing time: refers to the time period from when the supplier delivers the goods to the factory until the goods are actually ready for production and use.

[0016] Actual demand date: refers to the date when the material is actually used in the production process.

[0017] Actual supply date: refers to the date on which materials can be actually supplied to production, that is, the date after the delivery date plus processing time and rest days.

[0018] Gap Quantity: The difference bet...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The reschedule step includes following steps: (1) receiving new material need information, based on type of material, feasible period is determined; (2) determining need quantity and the supply quantity in these periods; (3) calculating rolling out or rolling in quantity in each period as well as transporting in or out quantity of materials; (4) rescheduling date to the first day of pointed period; (5) calculating out delivery date, new purchase orders are rearranged by using supply quantity as purchasing quantity in purchase order. When material required is changed, the invention rearranges purchase orders created so as to make quantity of material purchased more reasonable.

Description

【Field of Invention】 [0001] The present invention relates to a purchase order rearrangement system and method, in particular to a purchase order rearrangement system capable of rescheduling the original purchase order when the material demand changes during material demand planning and methods. [Background of the invention] [0002] In the manufacturing industry, most manufacturing enterprises use the Material Requirement Planning (MRP) system to manage the production process of the enterprise. In the ever-changing modern transaction mode, due to changes in customer order demand or other factors, the material requirements of manufacturing enterprises change, which leads to the need for manufacturing enterprises to rearrange the generated purchase orders from time to time. However, the existing SAPStandard MRP system cannot effectively deal with the rearrangement of purchase orders caused by changes in material requirements. For example, SAP Standard MRP cannot split the or...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Inventor 刘康立肖智彪吴宗霖李箐
Owner HONG FU JIN PRECISION IND (SHENZHEN) CO LTD
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More