Assembling method for large truss type pile leg structure
An assembly method and truss-type technology, which can be used in underwater structures, infrastructure engineering, sheet pile walls, etc., can solve the problems of high cost, large manpower and material resources, reduce welding deformation, improve work efficiency, and shorten construction. effect of cycles
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] First of all, same as the existing technology, for structural pipe fittings such as main side pipes, support pipes, inner horizontal pipes, etc. And realize the operation of extending the main side pipe.
[0023] Thereafter, as shown in Figure 1, under the horizontal construction mode, the monolithic structure of each leg segment is assembled based on the main side tube at one end, and the length of each monolithic structure is 15-25 meters. It is consistent with the length of the pile leg segment, and the optimal way is about 20 meters. Wherein, the assembling process of the monolithic structure is as follows: first, the horizontal pipe 2 is assembled with the main side pipe 1 as a reference, and then the lateral support pipe 3 is fixed between the horizontal pipe 2 and the main side pipe 1 . Mark 4 in Fig. 1 indicates two support pipes, which are installed as loose parts in the segmented assembly stage to realize the final assembly. In addition, the open ends of the...
Embodiment 2
[0027] Including the process of lengthening of the main side pipe—single-piece assembly of leg segments—segmental assembly of legs—general assembly of leg segments—closing of leg segments / total segments, but in the final stage , That is to complete the segmental assembly of the legs and realize the closing stage of the total segment, the legs can be directly segmented from bottom to top in the vertical state.
Embodiment 3
[0029] First of all, for the main side pipe, support pipe, inner horizontal pipe and other structural blanking, the welding of the main side pipe and support pipe and other pipe fittings and the lengthening of the main side pipe are completed. Afterwards, in the horizontal construction method, the single-piece structure of each leg segment is assembled based on the main side tube at one end.
[0030] Afterwards, as shown in Figure 2, in the horizontal construction mode, three identical single-piece structures are assembled into regular triangular truss-type leg segments by using tire frame devices. The assembly process is preferably as follows: first fix a monolithic structure 5 in a horizontal position, then assemble the monolithic structure 6 at the lower end of the main side tube, and then assemble another monolithic structure 7, and finally fix the pile legs in a horizontal position. Diagonal support pipe 8 between three horizontal pipes in section.
[0031] In the last ste...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com