The invention provides a metro foundation pit secant
pile shear key construction method without a feet-lock anchor cable, which comprises the following steps of: S1, determining a
pile position along a foundation pit sideline according to a drawing; s2, rotary digging and hole forming are carried out, and meat
pile holes and shear key holes are formed; shear key holes are positioned at the bottoms of the reinforced pile holes; s3, a reinforcement cage is put in, concrete is poured, and reinforced piles and shear keys are formed; s4, holes are formed in the plain piles, the bottoms of the holes enter the
bed rock surface by more than 1 m, then concrete is poured, the plain piles are formed, and the plain piles are engaged with the meat piles; s5, the steps S1 to S4 are repeated, and a closed foundation pit is formed; and S6, subway foundation pit construction is completed. According to the metro foundation pit secant pile shear key construction method without the feet-lock anchor cable and the rotary excavating
drill bit, a feet-lock
waist beam and the feet-lock anchor cable are omitted, external expansion of the foundation pit is not needed, earth and stone excavation is reduced,
mass migration and modification of surface pipelines are avoided, the influence on the surrounding environment is reduced,
land resources are intensified, and the construction efficiency is guaranteed.