The invention provides a repair technology for a drainage pressure reducing well. The repair technology includes the steps that first, cleaning is conducted in an original well; second, inserting tube tools are prepared, the inserting tube tools comprise a filter tube and steel retaining devices, the length of the filter tube is 0.5-1 meter larger than the length of a filter tube of a well tube of the original pressure reducing well, filter holes are evenly distributed in the outer wall of the fiber tube, the outer wall of the filter tube is coated with a filter net, a tube plug is arranged at the bottom end of the filter tube, the top end of the filter tube and the bottom end of a water rising tube are connected to form an inserting tube with the length being larger than the depth of the original pressure reducing well, the steel retaining devices are round pieces with inserting holes formed in the middles, and the diameter of the outer edge of each steel retaining device is equal to the inner diameter of the well tube of the original pressure reducing well; third, the inserting tube tools are inserted into the well tube of the original pressure reducing well in a downward mode, and the filling space of at least 80 mm is reserved between the inserting tube tools and the well tube of the original pressure reducing well; fourth, fifth, sixth and seventh, filter materials are evenly backfilled to the filter tube along the filling space so that the filter tube is full of the filter materials, coarse sand is backfilled to the position 1-1.2 meters higher than the bottom of the water rising tube, clay is backfilled to the position 2-2.2 meters lower than the top of the water rising tube, and concrete is backfilled to the position on the top of the water rising tube; eighth, a wellhead is manufactured. The pressure reducing well repaired through the method has an original drainage function, the phenomenon that a waste well is subjected to landfill treatment and is shifted again to build the pressure reducing well is avoided, and the project cost is lowered.