Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

3results about How to "Avoid relocation" patented technology

Multifunctional bridge high fill abutment structure

The utility model relates to a kind of high fill abutment structure of multi-functional bridge, belong to municipal bridge engineering field, including reinforcing section tunnel, pile foundation located below reinforcing section tunnel and abutment body located above reinforcing section tunnel, abutment body does one level embankment structure, it includes caisson bottom plate, caisson front wall, caisson back wall, caisson top plate and caisson baffle, abutment body uses caisson structure, abutment body is provided with bridge superstructure, bridge superstructure is erected with large pipeline above flood level, abutment body is provided with hole, hole is arranged with large pipeline in riverbed bottom, the thinking of caisson structure is integrated into abutment structure, and the role of embankment is also considered, and pipeline crossing bridge and tunnel are jointly built, improve the utilization of abutment, realize bridge and tunnel, embankment, pipeline coexistence by three-dimensional space integration, avoid relocation, reduce engineering coordination difficulty, overcome the expensive cost produced by traditional relocation pipeline or change tunnel position or change bridge site method.
Owner:GUANGZHOU MUNICIPAL ENG DESIGN & RES INST CO LTD

A positioning pillow that can support medical neck braces

ActiveCN224269655UComfortable lifting forcecomfortable sleeping positionNursing bedsPhysical medicine and rehabilitationCervical spine surgery
This utility model discloses a positioning pillow in the field of medical pillow technology that can support a medical neck brace. It includes a headrest, a neck pillow, a raised cushion, a shoulder rest, and a neck brace. Addressing the needs of patients after cervical spine surgery, it adds an adjustable headrest, neck pillow, and shoulder rest. The headrest and neck pillow can be individually adjusted in height to suit the patient's head comfort and provide a more comfortable sleeping posture. A positioning groove is also added to fit the medical neck brace, making it more comfortable for patients to sleep with the neck brace while preventing it from sliding up and down. It does not restrict the patient's left and right head turning movements, providing a certain level of comfort while ensuring the neck brace limits the patient's neck in a set position. Even after the neck brace is removed, the device still provides neck restraint, preventing the patient from nodding or tilting their head back while sleeping, avoiding adverse neck movements during sleep, and protecting patients who have removed the neck brace while sleeping.
Owner:FUZHOU SECOND HOSPITAL (FUZHOU FUZHOU HOSPITAL OF INTEGRATED TRADITIONAL CHINESE & WESTERN MEDICINE FUZHOU OCCUPATIONAL DISEASE HOSPITAL)

Single-hole double-line tunnel station integrated structure based on variable-diameter shield and construction method

ActiveCN121827835BReduce the diameter reduction requirementAchieve zero-occupancy constructionLine tubingTrackway
The application provides a single-hole double-line tunnel station integrated structure based on a variable-diameter shield, which comprises a shield tunnel and a track line, further comprises a shield station, the shield tunnel and the shield station are communicated and coaxial, a partition wall is arranged on the axis, and the track line is double-line and respectively arranged on the two sides of the partition wall; a construction method is further provided to realize the integrated structure. In the application, the double-layer station and the interval are constructed by using the variable-diameter shield method, so that the road occupation, pipeline relocation caused by the traditional open excavation method can be avoided, the pre-construction engineering such as traffic relief and green migration can be eliminated, the road zero-land occupation construction can be realized, compared with the open excavation method for constructing the station, the construction efficiency can be effectively improved and the construction period can be shortened by using the variable-diameter shield method for constructing the whole line.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD +1