The application provides a single-hole double-line tunnel
station integrated
structure based on a variable-
diameter shield, which comprises a shield tunnel and a track line, further comprises a shield
station, the shield tunnel and the shield
station are communicated and coaxial, a partition wall is arranged on the axis, and the track line is double-line and respectively arranged on the two sides of the partition wall; a construction method is further provided to realize the integrated structure. In the application, the double-layer station and the interval are constructed by using the variable-
diameter shield method, so that the road occupation, pipeline
relocation caused by the traditional open excavation method can be avoided, the pre-
construction engineering such as traffic relief and green migration can be eliminated, the road zero-
land occupation construction can be realized, compared with the open excavation method for constructing the station, the construction efficiency can be effectively improved and the construction period can be shortened by using the variable-
diameter shield method for constructing the whole line.