A technology of underground diaphragm wall and construction method, which is applied in the direction of excavation, artificial island, sheet pile wall, etc., can solve problems such as inability to meet requirements, and achieve the effects of convenient installation in time, reducing deformation and reducing impact.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The construction method of the present invention can start from the construction method pile sealing wall to carry out the continuous wall steel box construction in one direction, and can also start from the middle groove section to construct on both sides in turn. The following is combined with the accompanying drawings to start the continuous wall steel box from the middle. Construction is taken as an example to further illustrate the specific implementation of the present invention.
[0020] (1) As shown in Figure 1, at first the first auxiliary groove section A is grooved, cleared, the lower reinforcement cage, the lower first lock pipe 1, and poured concrete;
[0021] (2), as shown in Figure 2, when the concrete is initially set, the first lock pipe 1 is pulled out, and the steel sleeve box 4 is inserted in the first auxiliary groove section A;
[0022] (3), as shown in Figure 2, the second auxiliary groove section B adjacent to one end of the first auxiliary groov...